Latest event on Norther

Tideway to carry out scour protection works  from July 2018. The vessels Flintstone and Rollingstone are equipped with a downpipe system and an underwater robot to carefully place the stones on the bottom. The Rollingstone will place the blocks of stone (stones of nearly 120 kg each) through a separated large diameter pipe. Around 80,000 tons of filter material and 45,000 tons of stones will be installed in this way. This project includes the placing of two protective layers against the erosion in the places Read more

Latest Update: 01 July 2018

You can help keep this an open resource by submitting new information. Simply click on the correct pencil icon.
Developers/Owners/Operators Database in Excel | Add your Organisation
RoleOrganisation 
Developer
correct
Main Contractor-EPCI correct
Owner
Eneco Wind B.V
correct
Owner correct
Owner
Diamond Generating Europe Limited (Mitsubishi Corporation (三菱商事株式会社))
correct
Project Details for Norther
General Information Name Norther correct
Other names North Sea Power correct
Country name Belgium correct
Region Vlaanderen correct
Comments Norther decided not to connect to the Belgium Offshore Grid and is creating their own link back to shore. correct
Round (or category) Concession identified through decree of May 2004 correct
Development status Pre-Construction correct
Power & Turbines Project capacity 369.6 MW correct
Turbine model V164-8.0 MW (MHI Vestas Offshore Wind) correct
Turbine capacity 8 MW correct
Number of turbines 44 correct
Total turbine height correct
Hub height correct
Rotor diameter 164 m correct
Foundation Grounded: Monopile (Monopile weights are expected to vary between 670-963 tons with a diameter of 7.2-7.6 metres, dependent on the individual WTG location. The average weight and diameter is 795 tons and 7.4 metres, respectively.) correct
Windspeed 10 year mean wind speed (2000-2009) Available online now
Costs Stated project cost JPY(mill) 150000.00 correct
Location & Environment Sea name North Sea correct
Centre latitude 51.527° correct
Centre longitude 3.013° correct
Area 38 km2 correct
Depth range (Chart Datum) 13 m - 26 m correct
Depth range stated by developer 16 m - 33 m correct
Distance from shore (reported) 23 km correct
Distance from shore (computed from centre) 24 km correct
Ports Installation base Vlissingen correct
Ops and maintenance Ostend correct
Grid Converter/Collector platforms None correct
Offshore transformers Norther Substation correct
Grid connection point Zeebrugge correct
Cable landing point Zeebrugge correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of export cables 1 correct
Average length per cable 26 km correct
Transmission type (e.g. HVAC) correct
Nominal voltage 220 kV correct
Maximum voltage correct
Power rating correct
Number of cores correct
Conductor type correct
Section area correct
Insulation correct
Number fibre optics correct
Export minimum bend radius (MBR) correct
Burial depth correct
Comments Norther will connect straight to shore via its own export cable. correct
Onshore Cables Number of onshore cables 6 correct
Average length per cable 2 km correct
Comments 220kV correct
Array Cables Array cable length 70 km correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) correct
Nominal voltage 33 kV correct
Maximum voltage correct
Burial depth 1 m correct
Number of cores 3 correct
Conductor type correct
Section 185-800 mm2 correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments correct
Benefits Homes powered annually 261771 correct
CO2 reduced per year 529040 tonnes correct
SO2 reduced per year 12303 tonnes correct
Expected life correct
Other Website Visit correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at https://www.4coffshore.com/windfarms/windfarms.aspx?windfarmID=be04.