GE 4.1-113

this
Manufacturer: GE Energy
Status: Discontinued
Rated Power: Unlock with a freemium account

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
General Information
Name
GE 4.1-113
Manufacturer
GE Energy
Status
Discontinued
Comments
The turbine is designed specifically for the offshore environment. It has a once a year maintenance cycle maximizes in-situ repair reducing need for large repair vessels. Once the turbine is “crane ready”, the 4.1-113 should take no more than 7 days to install and commission. GE has installed the first 4.1MW offshore turbine in the Gothenburg harbour (onshore), Sweden, in December 2011. It passed its intial run.

Operating Data
Rated Power
Cut In Wind Speed
Rated Wind Speed
Cut Out Wind Speed

Rotor
Diameter
Power Density
Operational Interval

Power Regulation
Type

Electrical Data
Generator Type
Generator Power
Number of Generator Units
Output Voltage
Converter Type

Gearbox
Type

Weight(per blade)
Blade Material


Nacelle
Height

Warranty
Warranty

Warranty
Warranty
Selling Points
Selling Points

Copyright © 4C Offshore 2020

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore