SWT-7.0-154

this
Manufacturer: Siemens Gamesa
Status: Available for Commercial Deployment
Rated Power: Unlock with a freemium account

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
General Information
Name
SWT-7.0-154
Manufacturer
Siemens Gamesa
Status
Available for Commercial Deployment
Comments
Turbine will be produced by upgrading the existing 6MW. Siemens installed the turbine at it's wind turbine testing site in Østerild, Denmark on 19/05/2015. The turbine received full IEC-61400-22 compliance from DNV GL in January 2016. On 7th July 2016 Siemens signed a Memorandum of Understanding with CS Wind to produce up to 200 offshore wind turbine towers between 2017 and 2019.

Operating Data
Rated Power
Cut In Wind Speed
Rated Wind Speed
Cut Out Wind Speed

Rotor
Diameter
Power Density
Operational Interval

Power Regulation
Type

Electrical Data
Generator Type
Generator Power
Number of Generator Units
Output Voltage
Converter Type

Gearbox
Type

Weight(per blade)
Blade Material


Nacelle
Height

Warranty
Warranty

Warranty
Warranty
Selling Points
Selling Points

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore