24 Apr 2024: Update April 2024: Salamander has submitted for consent for both the generation and transmission assets. Design envelope: • Up to 7 turbines • Up to 8 mooring lines and anchors per turbine (56 total) • Maximum tip height of 310 m • Maximum rotor diameter of 250 m • Maximum hub height of 172.5 m • Power to shore either via extended array cable, or subsea hub Indicative construction plan: • Fabrication begins April 2026 • Onshore substation January 2027 - December 2028 • Onshore cable March 2027 - September 2028 • Offshore cable installation April 2028 - October 2028 • Mooring and anchor installation April 2028 - October 2028 • Turbine and substructure installation March 2029 - September 2029 • Full commissioning October 2029 Project expecting to submit for consents in Q1 2024.
Location:
United Kingdom
Status:
Consent Application Submitted
Capacity:
100 MW
4C Offshore | Location Map: Lat(57.616) Lon(-1.198)

Subscribers can track wind farms on their dashboard.

General Information
Name
Salamander
Other Names
INTOG3
Country
United Kingdom
Development Status
Consent Application Submitted
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Simply Blue Group

Simply Blue Group

Developer

Xodus Group Limited

Xodus Group Limited

Owner

Simply Blue Group

Simply Blue Group

Owner

Subsea 7

Subsea 7

Owner

Ørsted (UK) Limited

Ørsted (UK) Limited


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

4C Offshore marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. 4C Offshore grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the 4C Offshore interactive system, access reports, updates, news, downloads and more. To find out more about how 4C Offshore software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about 4C Offshore
Power & Turbines
Windfarm Capacity
100 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
57.615911°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
6
Average Length per Cable
Comments
Expected Life