4C Offshore Empowering Intelligence

Vineyard Northeast Offshore Wind Farm

25 Mar 2024: BOEM will publish a Notice of Intent (NOI) to prepare an Environmental Impact Assessment (EIA) for the Construction and Operation Plan (COP) of Vineyard Northeast. The publication will begin a 45 day consultation period, ending on 9th May 2024. During this period, BOEM will hold two virtual consultations on 15th and 22nd April 2024 as well as two in-person meetings on 17th and 18th April 2024.
Location:
United States
Status:
Concept/Early Planning
Capacity:
2500 MW
4C Offshore | Location Map: Lat(40.682) Lon(-70.228)

Subscribers can track wind farms on their dashboard.

General Information
Name
Vineyard Northeast
Other Names
Lease OCS-A 0522, VW 522; Liberty Wind; Vineyard Northeast
Country
United States
Development Status
Concept/Early Planning
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Vineyard Offshore

Vineyard Offshore

Owner

Copenhagen Infrastructure Partners

Copenhagen Infrastructure Partners


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
2500 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Atlantic Ocean
Latitude
40.681973°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life