TGS | Powered by 4C Offshore

4C is now TGS

We are excited to announce a significant milestone in 4C Offshore's journey. Our integration into the TGS family marks the beginning of a new era in offshore wind market intelligence.


Learn what this means for you!

Allseas T&I contract for Gennaker offshore wind farm

4C Offshore | Chloe Emanuel
By: Chloe Emanuel 29/04/2024 Allseas

Allseas has been contracted for the transport and installation (T&I) of two major substations (so called OSS) for the Gennaker offshore wind farm in the German Baltic Sea, developed by Skyborn Renewables.


Located 15 kilometres off the German coast near the Darß peninsula, and with a production capacity of 900 MW, Gennaker will be the largest and most powerful offshore wind farm in the Baltic Sea to date.


Awarded by the Dutch-Belgian HSI consortium – HSM Offshore Energy, Smulders and Iv – the contract is for the Gennaker West (OSS-DarB) and East(OSS-Zingst) converter platforms, including supporting suction buckets jackets. The HSI Joint Venture is responsible for delivering the two platforms.


Allseas will deploy its heavy lift vessel Pioneering Spirit for the project, utilising the vessel’s unique transport and lift capability to install the suction buckets jackets and the 61-metre-long, 34-metre-wide topsides in one offshore campaign. This reduces operations offshore, making the installations safer and faster.


This latest award further enhances Allseas’ offshore wind installation credentials, and the key role Pioneering Spirit is set to play delivering critical assets for offshore energy and wind developments across Europe.


For more intelligence on component trends for turbines, installation vessels, specifications and supply & demand analysis, click here.

Premium

4C Offshore Premium, our most popular subscription, gives you full access to use the 4C Offshore WebApp which includes exclusive offshore wind, transmission and vessel reports, news and downloads.

Request a 30 minute Demo

Trending News!