North Aegean Interconnection: Korinthos (2024) - Kos Interconnector

HVS Korinthos
North Aegean Interconnection: Korinthos (2024) - Kos
(900.000 MW)
Kos

Substation to Converter cabling information missing.

Converter information missing.

Landfall to Converter cabling information missing.

Landfall to Converter cabling information missing.

Converter information missing.

Substation to Converter cabling information missing.

Greece
Greece

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
Greece
AC Voltage
400 kV
Substation
HVS Korinthos

Subsea Cabling

Cable Name North Aegean Interconnection: Korinthos (2024) - Kos
Cable Type
Cable Current HVDC
Status Concept/Early Planning
Status Comments
Capacity MW 900.000 MW
Cable Tech
Total Length of Cable 385.00 km
Length Submarine 380.00 km
Length Land 5.00 km
DC Voltage 400 kV
AC Voltage
Configuration Bipolar
Project Cost Mill
Project Cost Currency
Website Visit
Project Comments

Country & Landfall 2

Country
Greece
Substation
Kos
Owner-Offshore Transmission
Stakeholder
Description
Date Event Description
Freemium Only 2030 Unlock with a freemium account Subscribers only field
Freemium Only 2028 Unlock with a freemium account The estimated cable installation start year based ... Subscribers only field