North Aegean Interconnection: Kos-Rhodes 2 (TPS) Interconnector

Kos
North Aegean Interconnection: Kos-Rhodes 2 (TPS)
Rhodes (Thermal Power Station)

Landfall to Substation information missing.

Landfall to Substation information missing.

Greece
Greece

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Country & Landfall 1

Country
Greece
Substation
Kos

Subsea Cabling

Cable Name North Aegean Interconnection: Kos-Rhodes 2 (TPS)
Cable Type
Cable Current HVAC
Status Concept/Early Planning
Status Comments
Capacity MW
Cable Tech
Total Length of Cable 145.00 km
Length Submarine 145.00 km
Length Land 0.00 km
DC Voltage
AC Voltage 150 kV
Configuration
Project Cost Mill
Project Cost Currency
Website Visit
Project Comments

Country & Landfall 2

Country
Greece
Substation
Rhodes (Thermal Power Station)
Owner-Offshore Transmission
Stakeholder
Description
Date Event Description
Freemium Only 2030 Unlock with a freemium account Subscribers only field
Freemium Only 2028 Unlock with a freemium account The estimated cable installation start year based ... Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore