23 Apr 2024: Cenos have submitted a new scoping report which delays the project by 2-3 years and reduces capacity to 1350 MW. The scoping report covers an updated project area and cable route, which will be approx 230 km. All of the below, with the exception of the HVAC substation and O&G cabling is only for connection to shore, and not any cable for the oil and gas electrification, which will be applied for separately in the future. Design envelope: • 68 to 95 turbines • 140 to 180 m hub height • up to 280 m rotor diameter • up to 320 m (TLP) / 310 m (semi-sub) tip height • 22m blade clearance • up to 1350 MW • 230 km cable corridor • up to 330 km(66 or 132 kV) inter-array cabling • 3 to 6 turbines per array cable string • up to 2 export cable (320 or 525 kV) and 1 fibre optic cable (if not bundled) Foundation design envelope: • Primary material: Steel • up to 115 m length • up to 100 m length • up to 40 m height • up to 9 mooring lines per platform • up to 850 m mooring line radius Substation design envelope (HVDC to shore): • up to 75 m length • up to 40 m width • up to 35 m height • up to 12,500 tonnes topside • up to 10,000 tonnes foundation An additional HVAC substation is being considered for a connection to the oil and gas assets which Cenos intends to power. This substation will be smaller and potential bridge connected to the HVDC substation. Design envelope: • up to 75 m length • up to 40 m width • up to 35 m height • up to 4,000 tonne topside • up to 3,200 tonne foundation O&G cabling design envelope: • Up to 10 cables • Cables of lengths 20 km, 31 km, 25 km, 37 km, 75 km, and 115 km. The varying lengths are for connection to different oil and gas platforms. • 66 kV • maximum diameter of 300 mm Indicative project timeline: • Consent application: Q4 2024 • Consent approved Q4 2025 • CFD award: 2026 (Allocation Round 8) • FID: 2027 • Manufacturing 2027-2032 • Offshore construction 2029-2033 • Substation and cable installation 2029-2030 • First power: 2030 • COD: 2033
Location:
United Kingdom
Status:
Concept/Early Planning
Capacity:
1350 MW
4C Offshore | Location Map: Lat(57.122) Lon(1.429)

Subscribers can track wind farms on their dashboard.

General Information
Name
Cenos
Other Names
Cenos Floating Offshore Windfarm; INTOG11
Country
United Kingdom
Development Status
Concept/Early Planning
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Flotation Energy plc

Flotation Energy plc

Owner

Flotation Energy plc

Flotation Energy plc

Owner

Vårgrønn

Vårgrønn


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

4C Offshore marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. 4C Offshore grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the 4C Offshore interactive system, access reports, updates, news, downloads and more. To find out more about how 4C Offshore software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about 4C Offshore
Power & Turbines
Windfarm Capacity
1350 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
54.963584°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life