4C Offshore Empowering Intelligence

Kincardine - phase 1 Floating Wind Farm

31 Dec 2021: Update April 2021: The initial 2 MW turbine is due to be reinstalled as KIN-06 in 2021(dependent on recertification and consultation). If Turbine 1 is not re-deployed within 6 months, it will be decommissioned. The initial period sought for such certification / verification / suitable agreed alternative of the WTG platform substructure for Turbine 1 (2MW) will be limited to be three years or less. This is due to the engineering life of the substructure (ten years from initial substructure construction in 2011). At the expiry of the WTG platform substructure certification, Turbine 1 will only be re-deployed if (i) the platform structure is recertified following inspection (and only for so long as valid certification is in place) and (ii) if Marine Scotland (in consultation with SNH, Historic Environment Scotland, Aberdeen City Council and Aberdeenshire Council) is satisfied that the re-deployment at the proposed location within the Site would not give rise to new or materially different likely significant effects to those identified in the seascape, landscape and visual assessment of the Variation Environmental Statement .
Location:
United Kingdom
Status:
Fully Commissioned
Capacity:
2 MW
4C Offshore | Location Map: Lat(57.006) Lon(-1.881)

Subscribers can track wind farms on their dashboard.

General Information
Name
Kincardine - phase 1
Other Names
KOWL; Kincardine Offshore Wind Farm
Country
United Kingdom
Development Status
Fully Commissioned
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Kincardine Offshore Windfarm Ltd

Kincardine Offshore Windfarm Ltd

Operator

Kincardine Offshore Windfarm Ltd

Kincardine Offshore Windfarm Ltd

Owner

Grupo COBRA

Grupo COBRA


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
GBP 220.73/MWh (EUR 262.16/MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
2 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
57.005747°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
1
Average Length per Cable
Comments
Expected Life