01 Sep 2023: Autumn project design update: 1. Size of array boundary reduced to mitigate impacts on other marine users. Potential effects on ferry routes is a concern for people – both individually and when considered alongside other developments in the Irish Sea. Decrease from 322 km2, to approximately 280km2 . To promote co-existence with fishing activities, it will maintaining an area within the array boundary that will be free of wind turbines and offshore substation platform(s). It has also increased the spacing from approximately 1,000m between rows of turbines and approximately 875m between each turbine in a row, to a minimum spacing of approximately 1,400m, both within and between rows. It is also committing to maintaining two ‘lines of orientation’ through the array area and our wind turbine rows will generally be orientated north to south. This will further aid in the safety of marine navigation, fishing activities and search and rescue within the array boundary . 2. Reduced the maximum number of turbines from 107 to 96. Increased the rotor diameter of the largest wind turbine from 280m to 320m. Due to ground conditions, removed the option of using monopile foundations but are still considering using gravity base and / or jacket foundations. 3. Working towards the submission of the project’s Development Consent Order (DCO) in 2024. Anticipate a final decision being made on the application in 2025. If the application is successful, expect to start construction in 2026 at the earliest. COD 28/29 earliest.
Location:
United Kingdom
Status:
Concept/Early Planning
Capacity:
1500 MW
4C Offshore | Location Map: Lat(53.989) Lon(-4.002)

Subscribers can track wind farms on their dashboard.

General Information
Name
Morgan
Other Names
Project Elizabeth; Yellow North
Country
United Kingdom
Development Status
Concept/Early Planning
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

EnBW-BP

EnBW-BP

Owner

BP plc

BP plc

Owner

EnBW Energie Baden-Württemberg AG

EnBW Energie Baden-Württemberg AG


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
1500 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Irish Sea and St Georges Channel
Latitude
53.989409°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
4
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
18
Average Length per Cable
Comments
Expected Life