Belgium 309MW Fully Commissioned

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Events overview for Rentel

Event Date Event Type Event Description Event Source
Subscribers only field Subscribers only field Subscribers only field Subscribers only field
Freemium Only 2020 Rentel issued a tender to select an offtaker for e... Subscribers only field Subscribers only field
Freemium Only 2019 Grid Connection Available Update: The MOG was inaugurated in a ceremony on 1... Subscribers only field Subscribers only field
Freemium Only 2019 Generating Power The Board of Directors, shareholders, lenders, gov... Subscribers only field Subscribers only field
Freemium Only 2019 Generating Power DEWI-OCC concluded the stage of its Certification ... Subscribers only field Subscribers only field
Freemium Only 2018 Fully Commissioned Rentel entered full operations in late 2018. DEWI-... Subscribers only field Subscribers only field
Freemium Only 2018 Export Cable Installation NKT successfully commissioned the 220kV AC hig vol... Subscribers only field Subscribers only field
Freemium Only 2018 Turbine Installation Installation of 42nd and final turbine, completed.... Subscribers only field Subscribers only field
Freemium Only 2018 Turbine Installation Sea Installer has installed 33 of 42 turbines.... Subscribers only field Subscribers only field
Freemium Only 2018 Generating Power 28  (of 42) turbines are currently installed and a... Subscribers only field Subscribers only field
Freemium Only 2018 Turbine Installation Sea Installer began installation of the 42 Rentel ... Subscribers only field Subscribers only field
Freemium Only 2018 Production and Procurement Sea Installer arrived at the offshore wind REBO te... Subscribers only field Subscribers only field
Freemium Only 2018 Production and Procurement Assembly of the wind turbine towers began at the P... Subscribers only field Subscribers only field
Freemium Only 2018 Production and Procurement First nacelles shipped from the Siemens factory in... Subscribers only field Subscribers only field
Freemium Only 2018 Production and Procurement The first load of nacelles have been shipped from ... Subscribers only field Subscribers only field
Freemium Only 2018 Production and Procurement The first turbine components (two blade sets and s... Subscribers only field Subscribers only field
Freemium Only 2018 Offshore Substation The installation of the offshore substation has be... Subscribers only field Subscribers only field
Freemium Only 2018 Production and Procurement The offshore substation departed the assembly yard... Subscribers only field Subscribers only field
Freemium Only 2018 Production and Procurement The offshore substation was loaded aboard a transp... Subscribers only field Subscribers only field
Freemium Only 2017 Foundation Installation Installation of foundations and transitions pieces... Subscribers only field Subscribers only field
Freemium Only 2017 Export Cable Installation The export cable made landfall in Zeebruges. This ... Subscribers only field Subscribers only field
Freemium Only 2017 Offshore Substation STX Europe announced that the substation foundatio... Subscribers only field Subscribers only field
Freemium Only 2017 Foundation Installation More than 33 foundations have been installed.... Subscribers only field Subscribers only field
Freemium Only 2017 Array Cable Installation Tideway will begin array cable installation in the... Subscribers only field Subscribers only field
Freemium Only 2017 Foundation Installation 14 monopiles have now been installed. Monopiles an... Subscribers only field Subscribers only field
Freemium Only 2017 Foundation Installation DEME uses jack-up vessel INNOVATION to install fir... Subscribers only field Subscribers only field
Freemium Only 2017 Production and Procurement Shipment of the first batch of four transition pie... Subscribers only field Subscribers only field
Freemium Only 2017 Other Approval The Board of Directors of Belgian TSO Elia has app... Subscribers only field Subscribers only field
Freemium Only 2017 Production and Procurement Fabrication of the major components will commence ... Subscribers only field Subscribers only field
Freemium Only 2016 Production and Procurement Fabrication of the substation began at STX's yard ... Subscribers only field Subscribers only field
Freemium Only 2016 Financing Agreement The European Commission approved support for the R... Subscribers only field Subscribers only field
Freemium Only 2016 Financial Close The Rentel wind farm reached financial close after... Subscribers only field Subscribers only field
Freemium Only 2016 Strategy or Policy Development The European Commission are to decide whether the ... Subscribers only field Subscribers only field
Freemium Only 2016 Subsidy/PPA Conditionally Secured Belgian Council of Ministers approved, on second r... Subscribers only field Subscribers only field
Freemium Only 2016 Financing Agreement The European Investment Bank approved a loan to Re... Subscribers only field Subscribers only field
Freemium Only 2016 Geotechnical Site Investigation G-Tec Offshore SA carried out a geotechnical site ... Subscribers only field Subscribers only field
Freemium Only 2015 Financing Agreement Otary NV submitted an application to the European ... Subscribers only field Subscribers only field
Freemium Only 2015 Other Approval Advice to the Staatssecretaris voor de Noordzeeis ... Subscribers only field Subscribers only field
Freemium Only 2015 Grid Connection Agreed The Minister of Energy approved two draft royal de... Subscribers only field Subscribers only field
Freemium Only 2015 Tender Process Tendering phase complete; preferred suppliers to b... Subscribers only field Subscribers only field
Freemium Only 2015 Geotechnical Site Investigation Second phase of geotechnical surveys scheduled las... Subscribers only field Subscribers only field
Freemium Only 2015 Other Approval Public consultations regarding the revised consent... Subscribers only field Subscribers only field
Freemium Only 2014 Consent Variation Submitted Rentel introduced a request for changing the permi... Subscribers only field Subscribers only field
Freemium Only 2014 Otary released a Tender for two lots. Lot 1 = Desi... Subscribers only field Subscribers only field
Freemium Only 2014 Other Approval Permits granted for the construction of 3 to 6 pow... Subscribers only field Subscribers only field
Freemium Only 2013 Consent Application Submitted Request for a permit and authorisation for the con... Subscribers only field Subscribers only field
Freemium Only 2013 Tender Process Elia Asset NV go to tender for the offshore grid: ... Subscribers only field Subscribers only field
Freemium Only 2013 Consent Authorised Authorisation granted for the park.... Subscribers only field Subscribers only field
Freemium Only 2012 Geotechnical Site Investigation First phase of geotechnical surveys underway lasti... Subscribers only field Subscribers only field
Freemium Only 2012 Consent Application Submitted Application and environmental information for wind... Subscribers only field Subscribers only field
Freemium Only 2009 Other Approval Concession granted.... Subscribers only field Subscribers only field