18 Oct 2021: Update: Published on 18th October 2021 (document dated 18th August). The assessment by Ricardo for the Regulatory Authority of Bermuda calls for: 1) A consultation process with relevant stakeholders. 2) A detailed assessment of the seabed in the proposed sites. 3) A wind measurement campaign. 4) An update of the 2019 IRP at the earliest opportunity. Previous update: following delays (see event 21/12/20) the pre-feasibility study is now delayed to the 2021-2022 work plan, so is unlikely to begin until at least late 2021 if the work plan is approved. The work plan is under consultation. According to the schedule set out in the June 2019 Integrated Resource Plan, environmental and social impact assessments will be carried out throughout 2020. Update - this has been included in the Regulatory Authorities 2020-2021 work programme, so is expected to be tendered for in 2020.
Location:
Bermuda
Status:
Concept/Early Planning
Capacity:
60 MW
4C Offshore | Location Map: Lat(32.261) Lon(-64.607)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
60 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Atlantic Ocean
Latitude
32.261229°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life