CGN Shanwei Houhu Offshore Wind Farm

25 Nov 2021: Update in December 2021: The last turbine was connected to grid which means all 91 turbines have been generating power. This is one of the largest offshore wind projects in operation in China. Update in June 2020, the grid connection test for Shanwei Houhu, Jiazi 1, and Jiazi 2 were scheduled from Sep 2020 to Aug 2022; besides, all three projects scheduled to become fully commissioning by end 2021. In Jan 2019, first power was scheduled in July 2020.
Location:
China
Status:
Fully Commissioned
Capacity:
500 MW
4C Offshore | Location Map: Lat(22.709) Lon(116.045)

Subscribers can track wind farms on their dashboard.

General Information
Name
CGN Shanwei Houhu
Other Names
中广核汕尾后湖500MW海上风电场 广东汕尾后湖500MW海上风电工程
Country
China
Development Status
Fully Commissioned
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

CGN Wind Energy Limited (中广核风力发电有限公司 )

CGN Wind Energy Limited (中广核风力发电有限公司 )

Owner

CGN Wind Energy Limited (中广核风力发电有限公司 )

CGN Wind Energy Limited (中广核风力发电有限公司 )

Owner

Guangdong Baolihua New Energy Co., Ltd. (广东宝丽华新能源股份有限公司)

Guangdong Baolihua New Energy Co., Ltd. (广东宝丽华新能源股份有限公司)


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
CNY 850/MWh (EUR 110.13/MWh)

How does the database work?

4C Offshore marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. 4C Offshore grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the 4C Offshore interactive system, access reports, updates, news, downloads and more. To find out more about how 4C Offshore software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about 4C Offshore
Power & Turbines
Windfarm Capacity
500 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
South China Sea
Latitude
22.709157°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
2
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life