Changle Area C - phase 1 Offshore Wind Farm

16 Jun 2022: Update June 2022: All turbines on the Changle C site have been installed. The construction period is extended to Dec 31, 2021. Update June 2, 2021: The construction period is extended to August 20, 2021. Installation of foundation and turbine (second batch) Installation period: March 20, 2021 to May 20, 2021 Vessels: "Fanheng 18", "Zhenhua 30", "Zhongxing 101", "Jiuxie 999", "Suqi Xinrong 10", "chuanzhengbo 1", Dongnan 05", "Haiweijiao 66"
Location:
China
Status:
Partial Generation/Under Construction
Capacity:
200 MW
4C Offshore | Location Map: Lat(25.837) Lon(120.034)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
200 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Haitan Strait
Latitude
25.837227°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life