Datang International Shantou Lemen I Offshore Wind Farm

28 Dec 2021: Update: this project has been fully commissioned on 28th December 2021. On Oct 26, the project held a ceremony marking the start of construction. Later it was confirmed that this refers to onshore construction. The offshore is expected to start construction in early 2021, aiming to grid connect 35 units of turbines by end 2021.
Location:
China
Status:
Fully Commissioned
Capacity:
245 MW
4C Offshore | Location Map: Lat(23.271) Lon(117.041)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
245 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
South China Sea
Latitude
23.270822°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life