Huadian Yangjiang Qingzhou III Offshore Wind Farm

31 Dec 2021: Update in September 2021: Vessels changed to Huaxi 5000, Huaxi 900, Huawu, Defu 15001, Changjiu Tug 5001, Jinjie Operation and Maintenance 7, Wind Power Operation and Maintenance 7, Green 001, Southeast 01, Gangjian Tuo 2006, Zhenxin Barge 1, Offshore 122, China Airlines 108, Tenghang 88, China Airlines 118, Rongping 107, Nanhai Jiu 115, Guohai Guoxin. PowerChina Guizhou Engineering Co., Ltd (中国电建贵州工程公司) undertaking foundations and turbines installation work within the bidding section II. Operation time: October 30, 2020 to December 31, 2021. Operating vessels: Huaxi 5000, Huaxi 900, Huawu, Defu 15001, Changjiang Tug 5001, Jinjie Operation and Maintenance 7. Update August 2022: It is known that all turbines on the site have been completely installed.
Location:
China
Status:
Partial Generation/Under Construction
Capacity:
500 MW
4C Offshore | Location Map: Lat(20.968) Lon(111.601)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
500 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
South China Sea
Latitude
20.967935°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life