Huaneng Shantou Lemen 2 Offshore Wind Farm

29 Dec 2023: The project was fully commissioned on 29 December 2023. Updates on Sep 2023: According to the latest progress of the project, this project should be connected to the grid at full capacity by the end of 2023. Updates on Dec 2022: According to the latest news, the project is scheduled to be connected to the grid at full capacity by September 2023. According to their plan, this project is expected to start the offshore construction in June 2022, install the first turbine in September 2022, install all the turbines in May 2023, the project being fully commissioned in June 2023.
Location:
China
Status:
Fully Commissioned
Capacity:
594 MW
4C Offshore | Location Map: Lat(23.218) Lon(117.043)

Subscribers can track wind farms on their dashboard.

General Information
Name
Huaneng Shantou Lemen 2
Other Names
华能汕头勒门海上风电场 2
Country
China
Development Status
Fully Commissioned
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Huaneng Power International Co., Ltd (华能国际电力股份有限公司 )

Huaneng Power International Co., Ltd (华能国际电力股份有限公司 )

Owner

Huaneng Power International Co., Ltd (华能国际电力股份有限公司 )

Huaneng Power International Co., Ltd (华能国际电力股份有限公司 )


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
594 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
South China Sea
Latitude
23.218273°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life