4C Offshore Empowering Intelligence

Shanghai Donghai Bridge I Offshore Wind Farm

10 May 2021: Maintenance of array cable at 13# wind turbine position between May 10 and May 26.
Location:
China
Status:
Fully Commissioned
Capacity:
102 MW
4C Offshore | Location Map: Lat(30.770) Lon(121.994)

Subscribers can track wind farms on their dashboard.

General Information
Name
Shanghai Donghai Bridge I
Other Names
上海东海大桥海上风电场一期工程
Country
China
Development Status
Fully Commissioned
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Shanghai Dong Hai Wind Power Generation Company Ltd (上海东海风力发电有限公司)

Shanghai Dong Hai Wind Power Generation Company Ltd (上海东海风力发电有限公司)

Operator

Shanghai Dong Hai Wind Power Generation Company Ltd (上海东海风力发电有限公司)

Shanghai Dong Hai Wind Power Generation Company Ltd (上海东海风力发电有限公司)

Owner

China Datang Corporation (中国大唐集团公司)

China Datang Corporation (中国大唐集团公司)

Owner

Shanghai Green Environmental Energy Co., Ltd 上海绿色环保能源有限公司

Shanghai Green Environmental Energy Co., Ltd 上海绿色环保能源有限公司

Owner

CGN Wind Energy Limited (中广核风力发电有限公司 )

CGN Wind Energy Limited (中广核风力发电有限公司 )

Owner

State Power Investment Corporation (SPIC) (国家电力投资集团)

State Power Investment Corporation (SPIC) (国家电力投资集团)

Owner

Shanghai Hengneng Enterprise Development Group Corporation (上海恒能企业发展集团公司)

Shanghai Hengneng Enterprise Development Group Corporation (上海恒能企业发展集团公司)


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
102 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Eastern China Sea
Latitude
30.770245°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life