4C Offshore Empowering Intelligence

Sinohydro Tianjin Nangang - phase 1 Offshore Wind Farm

03 Jul 2019: Fully Commissioned on this date.
Location:
China
Status:
Fully Commissioned
Capacity:
90 MW
4C Offshore | Location Map: Lat(38.668) Lon(117.633)

Subscribers can track wind farms on their dashboard.

General Information
Name
Sinohydro Tianjin Nangang - phase 1
Other Names
电建集团天津南港海上风电项目一期工程 天津南港海上风电场一期工程项目 中水电新能源开发有限责任公司南港海上风电项目一期工程
Country
China
Development Status
Fully Commissioned
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Sinohydro Renewable Energy Co.,Ltd(中国水电建设新能源开发有限公司)

Sinohydro Renewable Energy Co.,Ltd(中国水电建设新能源开发有限公司)

EPC(I)-Turnkey Windfarm

PowerChina Beijing Engineering Corporation Limited (中国电建集团北京勘测设计研究院有限公司)

PowerChina Beijing Engineering Corporation Limited (中国电建集团北京勘测设计研究院有限公司)

EPC(I)-Turnkey Windfarm

Tianjin Port & Channel Engineering Co.,Ltd (天津港航工程有限公司)

Tianjin Port & Channel Engineering Co.,Ltd (天津港航工程有限公司)

Operator

Sinohydro Renewable Energy Co.,Ltd(中国水电建设新能源开发有限公司)

Sinohydro Renewable Energy Co.,Ltd(中国水电建设新能源开发有限公司)

Owner

Sinohydro Renewable Energy Co.,Ltd(中国水电建设新能源开发有限公司)

Sinohydro Renewable Energy Co.,Ltd(中国水电建设新能源开发有限公司)

Owner

Tianjin Hongyuan Titanium Iron Co., Ltd (天津市宏远钛铁有限公司)

Tianjin Hongyuan Titanium Iron Co., Ltd (天津市宏远钛铁有限公司)


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
CNY 850/MWh (EUR 110.13/MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
90 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Yellow Sea
Latitude
38.667886°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life