Developers/Owners/Operators (11)

RoleOrganisation 
Developer
correct
Main Contractor-EPCI
THV Seawind (Dredging international and Fabricom GTI JV)
Client: LogIn
correct
Main Contractor-EPCI
DEME NV
Client: LogIn
correct
Operator
correct
Owner correct
Owner
EDF Energies Nouvelles Group (EDF SA)
correct
Owner correct
Owner correct
Owner correct
Owner
Societe Regionale d'Investissement de Wallonie
correct
Owner correct

Turbines (9)

RoleOrganisation 
Installer-Turbine
Installation of 18 x 6M turbines
Number of turbines installed: LogIn
correct
Main Contractor-Turbine Supply and Installation correct
Maintenance-Turbine
CMI
Client: LogIn
correct
Maintenance-Turbine correct
Manufacturer-Turbine
Supply 18 x 6M turbines. Senvion (formally Repower) is responsible for the installation, the commissioning and the testing of the turbines.
Nominal Capacity (MW): LogIn
correct
Manufacturer-Turbine(Blades)
LM Wind Power supplied 54 blades for the 18 Senvion 6.2M126 turbines.
correct
Manufacturer-Turbine(Tower) correct
Supplier-Crane(Turbine)
Palfinger Marine- und Beteilungs-GmbH
correct
Supplier-Crane(Turbine)
Palfinger Marine- und Beteilungs-GmbH
correct

Substations (1)

Foundations (9)

RoleOrganisation 
Contractor-Grouting(turbines) correct
Designer(Detailed)-Foundation(Turbine)
OWEC Tower AS
correct
Installer-Foundation(pre-piling) correct
Installer-Foundation(turbine) correct
Manufacturer-Foundation(PinPiles)
72 pre-piles
Number of piles manufactured: LogIn
correct
Manufacturer-Foundation(pre-fabricated pipes)
Supplied 22.35 tonnes of pre-fabricated steel pipes for use in construction of jacket foundations
correct
Manufacturer-Foundation(turbine) correct
Supplier-Crane(Transition Piece)
Palfinger Marine- und Beteilungs-GmbH
correct
Supplier-Flanges
Supplied 18 x Ø5500 mm flanges for Jacket foundations
correct

Array Cabling (4)

RoleOrganisation 
Installer-Array Cable(cable lay and burial) correct
Installer-Array Cabling
Installation of the 24 array cables. The installation included cable lay, cable burial, pulling into J-tube/shore and termination
Cable Length km: LogIn
correct
Manufacturer-Array Cabling correct
Supplier-Cable Protection Systems correct

Export Cabling (1)

Met Masts (0)

Consultants (3)

RoleOrganisation 
Consultant-Financial correct
Consultant-Financial correct
Consultant-Other
Marine warranty surveyors.
correct

Others (10)

RoleOrganisation 
Contractor-Other correct
Contractor-Other correct
Maintenance-Other correct
Port correct
Supplier-Helicopter correct
Supplier-Navigation Aids
Pharos Marine ltd
Client: LogIn
Manufactured navigation aids between 2008/2011
correct
Supplier-Other correct
Supplier-Other
Aluwind Danmark A/S
For the jacket foundations Aluwind supplied swing gates, hatches and mark plates.
correct
Surveyor-Geophysical
correct
Surveyor-Geotechnical
correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at https://www.4coffshore.com/windfarms/organisations.aspx?windfarmID=be10.