Aflandshage Offshore Wind Farm

12 Jul 2022: Update 12th July 2022: The Danish Energy Agency and Hvidovre Municipality launched a public consultation from 12 July 2022 – 6 September 2022. The consultation material, which is sent out for consultation now, thus consists of HOFOR's application for an establishment permit, the approved environmental impact report, a draft of the Danish Energy Agency's establishment permit, a draft of Hvidovre Municipality's §25 permit, three supplementary professional reports and consultation notes from the prior public hearing of the environmental impact report. If HOFOR applies for an establishment permit, it is expected that the environmental impact report for the project and HOFOR´'s application will be sent for consultation in mid-July (week 28).
Location:
Denmark
Status:
Consent Application Submitted
Capacity:
286 MW
4C Offshore | Location Map: Lat(55.434) Lon(12.565)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
286 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Øresund
Latitude
55.433858°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life