30 Aug 2022: Capacity of the Bornholm Energy Island has been expanded from 2 to 3 GW, with full commissioning still expected in 2030. This is inline with the extra 1 GW agreed under the 2022 Finance Act. It is expected that the tender framework for the offshore wind expansion at Energiø Bornholm will be set before the end of 2022. Denmark and Germany have also entered into a political agreement on the establishment of a cable from the energy island to Germany. Costs and benefits associated with the energy island are distributed equally between the parties. Based on the political agreement, Energinet and 50 Hertz must now enter into an agreement on the concrete design of the content of the agreement. The cable to be connected between Denmark and Germany will be around 470 km. Energinet will also install a 245 km long cable between two new stations on Bornholm and Zealand, mainland Denmark.
Location:
Denmark
Status:
Development Zone
Capacity:
950 MW
4C Offshore | Location Map: Lat(55.044) Lon(14.382)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
950 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Baltic Sea
Latitude
55.044086°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life