Lillebælt Syd (Lillegrund) Offshore Wind Farm

08 Apr 2022: The first consultation phase for the content and delimitation of the onshore environmental impact report will start on 08 April 2022 and run until and including 29 April 2022. The onshore infrastructure to be built by Lillebælt Vind A / S includes: landfall is at Lavensby; a transformer station at Lavensby Strand, Havnbjerg; a 6 km cable route from Lavensby beach to a high voltage station (66/150 kV) at Danfoss, Svenstrup. On the public transmission network, it is also necessary for Energinet to establish: a high voltage station at Danfoss, Svenstrup; a high voltage station at Gyden, Fynshav; and an associated cable route, approx 12 km, between the two. The Danish Environmental Protection Agency is responsible for issuing a section 25 permit for onshore facilities in accordance with the Environmental Assessment Act, and the Danish Energy Agency is responsible for the section 25 permit for the sea.
Location:
Denmark
Status:
Concept/Early Planning
Capacity:
160 MW
4C Offshore | Location Map: Lat(55.119) Lon(9.818)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
160 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Baltic Sea
Latitude
55.118716°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
2
Average Length per Cable
Comments
Expected Life