Status:
Development Zone
Capacity:
1000 MW
Location:
Denmark

Subscribers can track wind farms on their dashboard



General Information
Name
Nordsøen - Tender 9
Country
Denmark
Development status
Unlock with a freemium account
Category or Round
Unlock with a freemium account
Region
Upgrade your subscription to include Wind Farms or Cable unlock
Comments
Upgrade your subscription to include Wind Farms or Cable unlock
Website
Upgrade your subscription to include Wind Farms or Cable unlock

Developers/Owners/Operators
Type
Organisation

Offshore Construction Starts
Upgrade your subscription to include Wind Farms or Cable unlock
Submitted For Consent
Upgrade your subscription to include Wind Farms or Cable unlock
Consent Authorised
Upgrade your subscription to include Wind Farms or Cable unlock
Financial Close
Upgrade your subscription to include Wind Farms or Cable unlock
First Power
Upgrade your subscription to include Wind Farms or Cable unlock
Full Commissioning
Upgrade your subscription to include Wind Farms or Cable unlock

Revenue mechanism
Upgrade your subscription to include Wind Farms unlock
Revenue details
Upgrade your subscription to include Wind Farms unlock

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
22 Jun 2020: The government and a broad majority in the Folketing signed an agreement on an ambitious climate plan on 22nd June. The agreement, together with the agreement on a green waste sector, forms the first part of the government's overall climate action plan. The agreement includes plans for: · Establishment of two energy Islands by 2030; one at Bornholm at 2 GW and one in the North Sea at 3 GW. The North Sea Island will be expanded to 10 GW in the long term. The island in the North Sea is being expanded in phases as electricity consumption rises and the energy island joins trade links with other countries. The energy islands must not only produce electricity, but also in the long term be able to connect technologies that can store or convert the green power to green fuels (so-called "Power-to-X"). It is a condition of the projects that they are profitable. Work on the energy islands will start immediately and parties involved will be continuously updated of the scheduling. · The establishment of the second wind farm agreed in the 2018 energy agreement will be located at Hesselø with a capacity of 1 GW. The parties have agreed that the wind farm should be operational by 2027 and have advanced the schedule compared to the original 2018 agreement. · The third wind farm agreed in the 2018 energy agreement will be included in the first phase of the energy islands and will be realised by 2030. · The funds reserved for the connection of second and third projects of the Energy Agreement 2018 will be re-prioritized to finance elements of the agreement. · The parties agree that DKK 4 million will be allocated in 2020, DKK 121 million in 2021 and DKK 89 million in 2022 for a preliminary study of the two energy islands and the park at Hesselø, at the same time with the re-prioritization of the funds allocated for preliminary studies of parks 2 and 3 of the Energy Agreement 2018. The preliminary studies are the first step in the establishment of the energy islands. · The energy islands and Hesselø must be based on the principles of the Energy Agreement 2018, which states that in future, offshore wind should be market-driven as far as possible without public support. · Other key points of the agreement include: promotion of Power-to-X plants and CO2 capture technology; electrification of the heating sector; Support for biogas and other green gases; Sustainability requirements for biomass for energy; Green restructuring of the industry; and Transition to market-driven expansion of solar cells and onshore wind. The so-called mill ceiling (maximum of 1,850 onshore wind turbines) will be postponed from 2030 to 2040 and CfD tenders for new onshore turbines and solar will be launched in 2020 and 2021. In total, the agreement between the government and the Left, DF, Radical Left, SF, the Unity List, Conservatives, Liberal Alliance and the Alternative, together with the climate agreement for waste, results in CO2e reductions of DKK 3.4 million tonnes by 2030.
Power & Turbines
Windfarm capacity
1000 MW
Turbine model
Unlock with a freemium account
Other turbine(s) used
Upgrade your subscription to include Wind Farms unlock
Min. turbine capacity (MW)
Upgrade your subscription to include Wind Farms or Cable unlock
Max. turbine capacity (MW)
Upgrade your subscription to include Wind Farms or Cable unlock
Min. number of Turbines
Unlock with a freemium account
Max. number of Turbines
Upgrade your subscription to include Wind Farms or Cable unlock
Total turbine height
Upgrade your subscription to include Wind Farms unlock
Hub height
Upgrade your subscription to include Wind Farms unlock
Rotor diameter
Upgrade your subscription to include Wind Farms unlock
Foundation type
Unlock with a freemium account
Foundations on Wind Farm
Upgrade your subscription to include Wind Farms or Cable unlock
Foundation comments
Upgrade your subscription to include Wind Farms unlock

Location & Environment
Sea name
North Sea
Latitude
56.035332°
Longitude
Upgrade your subscription to include Wind Farms or Cable unlock
Area
Unlock with a freemium account
Depth range (chart datum)
Upgrade your subscription to include Wind Farms or Cable unlock
Depth range (stated by developer)
Upgrade your subscription to include Wind Farms or Cable unlock
Distance from shore (developer)
Unlock with a freemium account
Distance from shore (computed)
Upgrade your subscription to include Wind Farms or Cable unlock

Ports
Installation base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of offshore platform(s)
Shared platform type
Upgrade your subscription to include Wind Farms or Cable unlock
Grid connection point
Upgrade your subscription to include Wind Farms or Cable unlock
Cable landing point
Upgrade your subscription to include Wind Farms or Cable unlock

Export Cables (AC & DC)
Number of Export cables (AC)
Unlock with a freemium account
Average length per cable (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Additional requirements (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Nominal voltage (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Average length per cable (DC)
Unlock with a freemium account
Additional requirements (DC)
Upgrade your subscription to include Wind Farms or Cable unlock
Nominal voltage (DC)
Upgrade your subscription to include Wind Farms or Cable unlock

Nominal voltage
Upgrade your subscription to include Wind Farms or Cable unlock
Comments
Upgrade your subscription to include Wind Farms or Cable unlock

Onshore Cables
Number of Onshore cables
Average length per cable
Unlock with a freemium account
Comments
Upgrade your subscription to include Wind Farms or Cable unlock
Expected life
Upgrade your subscription to include Wind Farms unlock

Copyright © 4C Offshore 2021

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore