Area 2 (Eesti Energia) Offshore Wind Farm

01 Jun 2021: Enefit Green (Eesti Energia) is developing a project that overlaps with Ohaka Energia's application. Enefit Green submitted a letter to the TTJA to state that Ohaka Energia's application is not lawful and should not be considered as competition to its application: Enefit Green makes the following three points: 1- Technical Grid Connection documents are invalid - approvals should be individual but Ohaka's approval was based on Enefit Green's data. The grid connection approval is also for 1005 MW whereas the wind farm has planned capacity of 400 MW 2 - Building permits can only be granted to electricity producers. Ohaka Energia has not submitted any documents proving itself as an electricity producer 3 - Ohaka Energia (EUR 2500) does not have the required share capital to receive a building permit (EUR 31950).
Location:
Estonia
Status:
Concept/Early Planning
Capacity:
1005 MW
4C Offshore | Location Map: Lat(57.967) Lon(24.009)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
1005 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Gulf of Riga
Latitude
57.966563°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life