Baltic Blue - Area B - phase III Offshore Wind Farm

08 Aug 2018: The Supreme Court annulled the order of 20 June 2016 of the Hiiu County Governor to establish a marine plan for wind power production areas in Hiiu. The rest of the Hiiu Marine Spatial Plan remains valid. This is due to insufficient environmental impact assessments. Impacts and links between the wind turbines and the sea cables connecting them to the mainland were not identified and relevant studies were not carried out. In particular, no proper evaluation was carried out to identify the impacts of the proposed activity on Natura sites and protected species. Therefore, according to the Supreme Court, the decision to establish a plan was not lawful. 
Location:
Estonia
Status:
Cancelled
Capacity:
700 MW
4C Offshore | Location Map: Lat(58.750) Lon(22.014)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
700 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Baltic Sea
Latitude
58.749838°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life