Saare Liivi 2 Offshore Wind Farm

29 Aug 2023: August 28 was the deadline for submission of competing applications for the construction of an offshore wind farm in the areas of Livi 1 and Livi 2. Six competing applications were submitted for both areas, with the initial application there are seven competitors. Liivi Offshore OÜ, Aker Offshore Wind Europe GmbH, Viru Keemia Grupp AS, Sunly Wind OÜ, Edel Offshore Wind OÜ and the joint applicant UAB "Ignitis Renewables Projektai 6" and CI NMF Estonia Sea I HoldCo Coöperatief UA submitted their own competing application for the marine areas The TTJA checks the compliance of all submitted competing applications with the provisions of the Construction Code and then forwards them to the relevant state authorities for an opinion. After receiving feedback from the state authorities, the TTJA evaluates the competing applications according to the guidelines set forth in the law. Applications that meet the requirements will be auctioned no later than 60 days after the results of the application evaluation have been confirmed. The first auction is expected to take place in November or December of this year. The TTJA makes a refusal decision on applications that do not meet the requirements.
Location:
Estonia
Status:
Concept/Early Planning
Capacity:
1200 MW
4C Offshore | Location Map: Lat(57.960) Lon(23.021)

Subscribers can track wind farms on their dashboard.

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
1200 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Gulf of Riga
Latitude
57.994839°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life