Saare Liivi 4 Offshore Wind Farm

29 Sep 2022: The Consumer Protection and Technical Supervision Agency (TTJA) is the competent authority, which processes building permit applications and decides on the initiation of the building permit procedure and the granting of the building permit. TTJA forwarded the building permit applications for Saare-Liivi 1-4 to the relevant authorities. The Ministry of Finance and the Ministry of Finance have pointed out in their opinions that the areas of the submitted building permit applications overlap with the wind energy reserve areas specified in the Estonian maritime area plan. According to the Estonian marine area plan, there is a condition that the reserve areas can be put into use from 2027,If offshore wind is not possible to be developed in other areas based on studies carried out. the TTJA agreed with those points raised and proposed to the developer to exclude the reserve areas from the requested areas of Saare-Liivi 1-4 The Ministy of Defence stated that in their opinion, wind turbines with the parameters given in the developer's updated applications cannot be built in Saare-Liivi 1-4 areas. because the wind turbines with this developer height would reduce the radar's performance. Utilitas has replied to the TTJA regarding the height of the wind turbines stated in the Ministry of Defence's letter and they agreed to comply with the justified requirements for the total height of the wind turbines. it was then raised that in the application the minimum height was mentioned and not the maximum height, and that it is crucial to include these technical information. in the latest communication dated 29th September 2022 the TTJA asks the developer to submit their objections and comments to the presented opinions and to correct and supplement the building permit applications. TTJA are waiting for OÜ Utilitas Wind's written response no later than 28th October 2022.
Location:
Estonia
Status:
Concept/Early Planning
Capacity:
1200 MW
4C Offshore | Location Map: Lat(58.012) Lon(23.392)

Subscribers can track wind farms on their dashboard.

How does the database work?

4C Offshore marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. 4C Offshore grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the 4C Offshore interactive system, access reports, updates, news, downloads and more. To find out more about how 4C Offshore software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about 4C Offshore
Power & Turbines
Windfarm Capacity
1200 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Gulf of Riga
Latitude
58.011709°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life