Tahkoluoto Extension Offshore Wind Farm

Status:
Concept/Early Planning
Capacity:
720 MW
Location:
Finland

As an Offshore Wind Farm Subscriber, you can follow this project to add it to your dashboard.

Follow this project


General Information
Name
Tahkoluoto Extension
Country
Finland
Development status
Unlock with a freemium account
Category or Round
Unlock with a freemium account
Region
Subscribers only field
Comments
Subscribers only field
Website
Subscribers only field

Developers/Owners/Operators
Type
Organisation

Key Dates
Park Construction Starts
Subscribers only field
Offshore Construction Starts
Subscribers only field
Submitted For Consent
Subscribers only field
Consent Authorised
Subscribers only field
Financial Close
Subscribers only field
First Power
Subscribers only field
Full Commissioning
Subscribers only field

Costs
Stated project cost
Subscribers only field
Revenue mechanism
Subscribers only field
Revenue details
Subscribers only field

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
28 Apr 2020: Suomen Hyötytuuli initiated its EIA programme for the extension project. The deadline for comments is the 29th May. The EIA covers three options: Option 0 (VE0): No project: no offshore wind farm to be built. Option 1 (VE1): A maximum of 40 power plants with a total height of up to 300 meters and a unit capacity of approximately 11-16 MW will be located in the project area. The offshore wind farm will be built in one area with an area of ··about 128 km2. Option 2 (VE2): A maximum of 45 power plants with a total altitude of up to 300 meters and a unit capacity of approximately 11-16 MW will be located in the project area. The offshore wind farm will be built in the same place as VE1, but with an additional area of ··approximately 7.8 km2 to the north-east of it, in which case the total area will be approximately 135 km2. In both VE1 and VE2, electricity transmission to Tahkoluoto will be carried out by submarine cables, and if necessary, a marine substation will be built in the area of ··the offshore wind farm. The wind farms will be connected to the existing electricity grid in Tahkoluoto. Note: An EIA programme includes: Basic information about the project, its options and technical description • Schedule for the project and the EIA procedure, as well as a plan for organizing participation and information • Description of the current status of the project and review areas and a plan of what impacts will be assessed and the methods used to carry out the assessments. In the second stage of the EIA procedure, an EIA report is prepared on the basis of the EIA program and the opinions and opinions issued on it, as well as the environmental impacts of the project, their significance, comparison of assessed alternatives and mitigation measures. The EIA procedure ends when the contact authority (ELY Center of Southwest Finland) submits its reasoned conclusion to the person responsible for the project.
Power & Turbines
Windfarm capacity
720 MW
Turbine model
Unlock with a freemium account
Other turbine(s) used
Subscribers only field
Min. turbine capacity (MW)
Subscribers only field
Max. turbine capacity (MW)
Subscribers only field
Min. number of Turbines
Unlock with a freemium account
Max. number of Turbines
Subscribers only field
Total turbine height
Subscribers only field
Hub height
Subscribers only field
Rotor diameter
Subscribers only field
Foundation type
Unlock with a freemium account
Foundations on Wind Farm
Subscribers only field
Foundation comments
Subscribers only field

Location & Environment
Sea name
Gulf of Bothnia
Latitude
61.673°
Longitude
Subscribers only field
Area
Unlock with a freemium account
Depth range (chart datum)
Subscribers only field
Depth range (stated by developer)
Subscribers only field
Distance from shore (developer)
Unlock with a freemium account
Distance from shore (computed)
Subscribers only field

Ports
Installation base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of offshore platform(s)
Shared platform type
Subscribers only field
Grid connection point
Subscribers only field
Cable landing point
Subscribers only field

Export Cables (AC & DC)
Number of Export cables (AC)
Unlock with a freemium account
Average length per cable (AC)
Subscribers only field
Additional requirements (AC)
Subscribers only field
Nominal voltage (AC)
Subscribers only field
Average length per cable (DC)
Unlock with a freemium account
Additional requirements (DC)
Subscribers only field
Nominal voltage (DC)
Subscribers only field

Array Cables
Array cable length
Subscribers only field
Nominal voltage
Subscribers only field
Comments
Subscribers only field

Onshore Cables
Number of Onshore cables
Average length per cable
Unlock with a freemium account
Comments
Subscribers only field
Expected life
Subscribers only field