4C Offshore Empowering Intelligence

Provence Grand Large Floating Wind Farm

05 Jun 2023: Update 30 May 2023: all three foundations have been floated out. Turbine integration will now occur imminently. Update 28 April 2023: load-out of the completed floaters is scheduled for a few weeks from now. Turbine integration will happen then. Update 5th April 2023: The turbine components have arrived at he Gloria quay in Port-Saint-Louis-du-Rhône. Turbine installation at quayside to commence in due course. Update November: delayed until 2023. VINCI Construction France is preparing the Quay for docking of the foundations and installation of the turbines. The blades, nacelle and hub will be transported to the Port in June 2022. Anticipated that installation of the turbine onto the foundation at Quayside will happen H2 2022. Offshore installation will take place next year.
Location:
France
Status:
Under Construction
Capacity:
25.2 MW
4C Offshore | Location Map: Lat(43.189) Lon(4.794)

Subscribers can track wind farms on their dashboard.

General Information
Name
Provence Grand Large
Other Names
Appel à projets - Fermes pilotes éoliennes flottantes Faraman, PGL; Les éoliennes flottantes de Provence Grand Large; Parc Eolien Offshore de Provence Grand Large
Country
France
Development Status
Under Construction
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

EDF Energies Nouvelles Group

EDF Energies Nouvelles Group

Operator-Offshore Transmission

Réseau de Transport d'Electricité (RTE)

Réseau de Transport d'Electricité (RTE)

Owner

EDF Energies Nouvelles Group

EDF Energies Nouvelles Group

Owner

Canada Pension Plan Investment Board (CPPIB)

Canada Pension Plan Investment Board (CPPIB)

Owner

Enbridge Inc.

Enbridge Inc.

Owner-Offshore Transmission

Réseau de Transport d'Electricité (RTE)

Réseau de Transport d'Electricité (RTE)


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
EUR 240/MWh (EUR 240/MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
25.2 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Mediterranean Sea
Latitude
43.188833°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
3
Average Length per Cable
Comments
Expected Life