Provence Grand Large Floating Wind Farm

15 Apr 2024: February 2024: project will be fully commissioned in spring 2024. May 2023: Commissioning at the beginning of 2024, according to EDF Renewables. February 2023: the three floaters are still expected to be commissioned end-2023 according to SBM. August 2022: Commissioning by end -2023. February 2022: Finalization of the preparatory work followed by the installation phase at sea during 2022. Testing, acceptance and commissioning of pilot fleet equipment in Spring 2023. September 2021: likely delayed due to ongoing appeals. February 2021: The start-up of the installation of the wind turbines is scheduled for the second half of 2022 (two years later than planned) and commissioning in April 2023. The “test” phase will last 20 years. Update: potentially delayed by up to 2 years due to appeals submitted against consents. Project due to be commissioned by 2021.
Location:
France
Status:
Under Construction
Capacity:
25.2 MW
4C Offshore | Location Map: Lat(43.189) Lon(4.794)

Subscribers can track wind farms on their dashboard.

General Information
Name
Provence Grand Large
Other Names
Appel à projets - Fermes pilotes éoliennes flottantes Faraman, PGL; Les éoliennes flottantes de Provence Grand Large; Parc Eolien Offshore de Provence Grand Large
Country
France
Development Status
Under Construction
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

PEOPGL - Parc Eolien Offshore de Provence Grand Large

PEOPGL - Parc Eolien Offshore de Provence Grand Large

Operator-Offshore Transmission

Réseau de Transport d'Electricité (RTE)

Réseau de Transport d'Electricité (RTE)

Owner

Canada Pension Plan Investment Board (CPPIB)

Canada Pension Plan Investment Board (CPPIB)

Owner

Enbridge Inc.

Enbridge Inc.

Owner

EDF Energies Nouvelles Group

EDF Energies Nouvelles Group

Owner-Offshore Transmission

Réseau de Transport d'Electricité (RTE)

Réseau de Transport d'Electricité (RTE)


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
EUR 240/MWh (EUR 240/MWh)

How does the database work?

4C Offshore marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. 4C Offshore grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the 4C Offshore interactive system, access reports, updates, news, downloads and more. To find out more about how 4C Offshore software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about 4C Offshore
Power & Turbines
Windfarm Capacity
25.2 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Mediterranean Sea Western Basin
Latitude
43.188833°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
3
Average Length per Cable
Comments
Expected Life