Projet d’éoliennes en mer au large de la Normandie

Status:
Development Zone
Capacity:
1000 MW
Location:
France

As an Offshore Wind Farm Subscriber, you can follow this project to add it to your dashboard.

Follow this project


General Information
Name
Projet d’éoliennes en mer au large de la Normandie
Other names
Normandy
Country
France
Development status
Unlock with a freemium account
Category or Round
Unlock with a freemium account
Region
Subscribers only field
Comments
Subscribers only field
Website
Subscribers only field

Developers/Owners/Operators
Type
Organisation

Key Dates
Park Construction Starts
Subscribers only field
Offshore Construction Starts
Subscribers only field
Submitted For Consent
Subscribers only field
Consent Authorised
Subscribers only field
Financial Close
Subscribers only field
First Power
Subscribers only field
Full Commissioning
Subscribers only field

Costs
Stated project cost
Subscribers only field
Revenue mechanism
Subscribers only field
Revenue details
Subscribers only field

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
21 Apr 2020: The French government confirmed its Multi-Year Energy Programming/Les programmations pluriannuelles de l’énergie (PPE) which forms the strategic roadmap for energy and climate for the period 2019-2023 and 2024-2028. Following the online public consultation which took place from 20th January to 20th February 2020 with 6,295 contributions recieved, the PPE was formally adopted by decree on 21st April 2020. A summary of the public opinions, the reasons for the decision to adopt the PPE, an environmental statement, the final PPE document (and summaries) and the adoption decree have been published by the ministry. The PPE sets targets of 40% renewable energy generation by 2030. All coal plants are to close by 2022, and 14 nuclear reactors by 2035 to achieve 50% share of nuclear electricity. The long term goal is carbon neutrality by 2050. A first draft of the PPE was published January 2019 but there was considerable backlash that renewable energy targets, including offshore wind, were too low. Offshore wind objectives have been revised upwards taking advantage of the drop in prices recorded on the Dunkirk tender in June 2019. Overall, 2.4 GW will be installed by 2023, and 3.75 GW will be tendered from 2020-2023, leading to an operational target of 5.2-6.2 GW (against previous targets of 4.7-5.2 GW) by 2028. The tender for a 1 GW project off the coast of Normandy will be launched in 2021. The Oléron offshore wind area has also been re-introduced to the PPE after omission from the January 2019 draft with tender awarded expected 2021-22. A further 1 GW fixed offshore wind farm will be awarded in 2023. One 250 MW floating project in Brittany will be awarded in 2021 and two 250 MW floating projects in the Mediterranean will be awarded in 2022. From 2024 the Government has increased annual targets from 500 MW to 1 GW for a combination of fixed and/or floating. Tendered projects will mostly involve extending previous wind farms with shared transmission systems to enable cost savings.
Power & Turbines
Windfarm capacity
1000 MW
Turbine model
Unlock with a freemium account
Other turbine(s) used
Subscribers only field
Min. turbine capacity (MW)
Subscribers only field
Max. turbine capacity (MW)
Subscribers only field
Min. number of Turbines
Unlock with a freemium account
Max. number of Turbines
Subscribers only field
Total turbine height
Subscribers only field
Hub height
Subscribers only field
Rotor diameter
Subscribers only field
Foundation type
Unlock with a freemium account
Foundations on Wind Farm
Subscribers only field
Foundation comments
Subscribers only field

Location & Environment
Sea name
English Channel/North Sea
Latitude
50.062°
Longitude
Subscribers only field
Area
Unlock with a freemium account
Depth range (chart datum)
Subscribers only field
Depth range (stated by developer)
Subscribers only field
Distance from shore (developer)
Unlock with a freemium account
Distance from shore (computed)
Subscribers only field

Ports
Installation base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of offshore platform(s)
Shared platform type
Subscribers only field
Grid connection point
Subscribers only field
Cable landing point
Subscribers only field

Export Cables (AC & DC)
Number of Export cables (AC)
Unlock with a freemium account
Average length per cable (AC)
Subscribers only field
Additional requirements (AC)
Subscribers only field
Nominal voltage (AC)
Subscribers only field
Average length per cable (DC)
Unlock with a freemium account
Additional requirements (DC)
Subscribers only field
Nominal voltage (DC)
Subscribers only field

Array Cables
Array cable length
Subscribers only field
Nominal voltage
Subscribers only field
Comments
Subscribers only field

Onshore Cables
Number of Onshore cables
Average length per cable
Unlock with a freemium account
Comments
Subscribers only field
Expected life
Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore