Baltic Eagle Offshore Wind Farm

22 Apr 2022: Update 22nd April 2022: The German Federal Maritime and Hydrographic Agency (BSH) issued planning approval for a total capacity of 476.25 MW. The approval covers: 50 offshore wind turbines with a capacity of 9.525 MW each, with a rotor diameter of 174 m and tip height of 194 m above sea level; 66 kV array cabling; and one unmanned transformer platform (USP). The OWTs are erected on monopile foundations at a water depth of 41 to 45 m . Iberdrola has selected MHI Vestas Offshore Wind as the official supplier of the MVOW V174 wind turbines to be delivered and installed by 2024. For its part, the foundations will be carried out by Asturian Windar and German EEW SPC. The transport and installation of the foundations as well as the supply, transport and installation of the interconnection cables have been awarded to Van Oord. The offshore substation converts power from 66 kV to 220 kV. It will be installed and ran by 50Hertz, the transmission system operator in north-eastern Germany. The wind farm will be connected to the Lubmin onshore wind farm via two high voltage subsea cables, each measuring 90 km, which will also be installed by 50Hertz. Update 5th January 2022: according to Iberdrola the plan approval decision from the BSH is this still pending. It is expected over the coming weeks. December 2020: Baltic Eagle GmbH, Hamburg, submitted an application to the Federal Maritime and Hydrographic Agency (BSH) to continue the plan approval procedure for the construction and operation of the offshore wind farm (OWP ) "Baltic Eagle". Planning approval of the project expected Q2 2021.
Location:
Germany
Status:
Pre-Construction
Capacity:
476 MW
4C Offshore | Location Map: Lat(54.828) Lon(13.860)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
476 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Baltic Sea
Latitude
54.828349°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
6
Average Length per Cable
Comments
Expected Life