21 Apr 2022: Amprion has launched information events about connections LanWin1 and LanWin3 from the end of April to mid-May. Subsea cables will transport power from wind farms to network connection points in Wehrendorf in Lower Saxony (LanWin1) and in Westerkappeln in North Rhine-Westphalia (LanWin3). LanWin1 is a connection that is around 390 kilometers long. About 170 kilometers of it are at sea. LanWin3 also has a total route length of around 390 kilometers, of which around 160 kilometers are at sea. LanWin1 is scheduled to go into operation in 2031 and LanWin3 in 2033.  The projects were originally included in the NEP (2021) as NOR-12-1 and NOR-11-1 but were reconfigured in the latest draft FEP, published April 2022. Connections are re-routed to the BalWin Cluster via NOR-9-1 and NOR-10-1 to Wehrendorf in Lower Saxony and in Westerkappeln in North Rhine-Westphalia. Clarity is desperately needed to confirm routes and schedules so TSOs can start work.
Location:
Germany
Status:
Development Zone
Capacity:
2000 MW
4C Offshore | Location Map: Lat(54.650) Lon(6.062)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
2000 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
54.65049°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life