17 Dec 2021: The BSH published an update to the Area Development Plan (FEP) in late 2021 to reflect the revised offshore wind targets for 30 GW by 2030 and 40 GW by 2035 and 70 GW by 2045. The FEP identifies priority and reservation areas for offshore wind energy for up to 43 GW, increasing the total identified potential to 57.5 GW. This is sufficient to meet 30 GW by 2030 and 40 GW by 2035. In order to achieve the expansion target of 70 GW by 2045 additional areas must be identified. N-12.1 (1GW) and N-12.1 (1GW) will connect via NOR-12-1 (2 GW) transmission system. The FEP does not yet include specific tendering and commissioning years. There is uncertainty with regard to the acceleration potential of the network connections. The TSOs request immediate confirmation so investigations and planning for converters and transmission routes experience minimal disruption. The Network Development Plan 2037/45 (2023) also in progress. Scenario framework was published early 2022. Following consultation, a further draft FEP is expected in mid-2022.
Location:
Germany
Status:
Development Zone
Capacity:
2000 MW
4C Offshore | Location Map: Lat(54.768) Lon(6.162)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
2000 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
54.767677°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life