26 Feb 2021: UPDATE: On 26th February the Federal Network Agency announced the launch of the tender for areas N-3.7 (225 MW), N-3.8 (433 MW) and O-1.3 (300 MW). The bidding window closes on 1st September 2021. The windfarms will connect to the NOR-3-3 and OST-1-4 transmission systems to be built by TenneT and 50 Hertz.The BSH has conducted extensive preliminary studies of the marine environment, the subsoil and the wind and oceanographic conditions of the sites to determine their suitability. The costs of the preliminary investigation should be passed on to the successful bidders after the award. The tenders are the first to be based on the new central model. Bids will be awarded based on lowest price. The maximum value for bids is 7.3 ct / kWh. The WindSeeG law now stipulates that a lottery will determine the winner from multiple zero subsidy bids. However, if other developers hold previous rights to develop the sites and if at least 50% of their project overlaps with the tender area they have a right to step in and obtain the site providing they match the winning bid. Innogy (RWE) and Northland Power previously held rights for the Nordsee Two (384 MW) project within the same area of N-3.8 and meets the prerequisites under the WindSeeG act (Section 40 Paragraph 1) to exercise a 'right of entry'. Iberdrola previously held rights to develop the Windanker (250 MW) project within O-1.3 and can exercise its right of entry. Both projects previously failed to win/declined to bid in the 2017/2018 transitional tenders. After bids are decided, Developers will still need to apply for relevant construction approval. The completion of the wind farms is planned for the year 2026. According to the Area Development Plan (FEP 2020) Areas O-1.3 (300 MW) will be tendered in 2021 for commissioning in 2026. According to the the network development plan (NEP) 2035 (2021) connection is via OST 1-4 (Ostwind3) using 300 MW, 220 kV, HVAC technology, and will start implementation from 2022 for commissioning 2026.
Status:
Development Zone
Capacity:
433 MW
Location:
Germany

Subscribers can track wind farms on their dashboard



General Information
Name
N-3.8
Country
Germany
Development status
Unlock with a freemium account
Category or Round
Unlock with a freemium account
Region
Upgrade your subscription to include Wind Farms or Cable unlock
Comments
Upgrade your subscription to include Wind Farms or Cable unlock
Website
Upgrade your subscription to include Wind Farms or Cable unlock

Developers/Owners/Operators
Type
Organisation
Operator-Offshore Transmission
Owner-Offshore Transmission

Offshore Construction Starts
Upgrade your subscription to include Wind Farms or Cable unlock
Submitted For Consent
Upgrade your subscription to include Wind Farms or Cable unlock
Consent Authorised
Upgrade your subscription to include Wind Farms or Cable unlock
Financial Close
Upgrade your subscription to include Wind Farms or Cable unlock
First Power
Upgrade your subscription to include Wind Farms or Cable unlock
Full Commissioning
Upgrade your subscription to include Wind Farms or Cable unlock

Revenue mechanism
Upgrade your subscription to include Wind Farms unlock
Revenue details
Upgrade your subscription to include Wind Farms unlock

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!
Power & Turbines
Windfarm capacity
433 MW
Turbine model
Unlock with a freemium account
Other turbine(s) used
Upgrade your subscription to include Wind Farms unlock
Min. turbine capacity (MW)
Upgrade your subscription to include Wind Farms or Cable unlock
Max. turbine capacity (MW)
Upgrade your subscription to include Wind Farms or Cable unlock
Min. number of Turbines
Unlock with a freemium account
Max. number of Turbines
Upgrade your subscription to include Wind Farms or Cable unlock
Total turbine height
Upgrade your subscription to include Wind Farms unlock
Hub height
Upgrade your subscription to include Wind Farms unlock
Rotor diameter
Upgrade your subscription to include Wind Farms unlock
Foundation type
Unlock with a freemium account
Foundations on Wind Farm
Upgrade your subscription to include Wind Farms or Cable unlock
Foundation comments
Upgrade your subscription to include Wind Farms unlock

Location & Environment
Sea name
North Sea
Latitude
54.067962°
Longitude
Upgrade your subscription to include Wind Farms or Cable unlock
Area
Unlock with a freemium account
Depth range (chart datum)
Upgrade your subscription to include Wind Farms or Cable unlock
Depth range (stated by developer)
Upgrade your subscription to include Wind Farms or Cable unlock
Distance from shore (developer)
Unlock with a freemium account
Distance from shore (computed)
Upgrade your subscription to include Wind Farms or Cable unlock

Ports
Installation base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of offshore platform(s)
1
Shared platform type
Upgrade your subscription to include Wind Farms or Cable unlock
Grid connection point
Upgrade your subscription to include Wind Farms or Cable unlock
Cable landing point
Upgrade your subscription to include Wind Farms or Cable unlock

Export Cables (AC & DC)
Number of Export cables (AC)
Unlock with a freemium account
Average length per cable (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Additional requirements (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Nominal voltage (AC)
Upgrade your subscription to include Wind Farms or Cable unlock
Number of export cables (DC)
0
Average length per cable (DC)
Unlock with a freemium account
Additional requirements (DC)
Upgrade your subscription to include Wind Farms or Cable unlock
Nominal voltage (DC)
Upgrade your subscription to include Wind Farms or Cable unlock

Nominal voltage
Upgrade your subscription to include Wind Farms or Cable unlock
Comments
Upgrade your subscription to include Wind Farms or Cable unlock

Onshore Cables
Number of Onshore cables
Average length per cable
Unlock with a freemium account
Comments
Upgrade your subscription to include Wind Farms or Cable unlock
Expected life
Upgrade your subscription to include Wind Farms unlock

Copyright © 4C Offshore 2021

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore