Germany 302MW Fully Commissioned

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Events overview for Amrumbank West

Event Date Event Type Event Description Event Source
Subscribers only field Subscribers only field Subscribers only field Subscribers only field
Freemium Only 2019 Offshore Substation Partial shutdown of the Helwin 2 offshore converte... Subscribers only field Subscribers only field
Freemium Only 2019 Onshore Substation Shutdown of all 690MW capacity at the Helwin 2 -Bü... Subscribers only field Subscribers only field
Freemium Only 2018 Turbine MPI Adventure carried out maintenance work on the ... Subscribers only field Subscribers only field
Freemium Only 2016 Foundation CWind has undertaken inspections of the monopiles,... Subscribers only field Subscribers only field
Freemium Only 2016 Turbine MPI's vessel, MPI Resolution, was contracted to ca... Subscribers only field Subscribers only field
Freemium Only 2016 Generating Power The full 302MW of capacity is now operational, inc... Subscribers only field Subscribers only field
Freemium Only 2016 E.ON announced it has upgraded the wind farm's cap... Subscribers only field Subscribers only field
Freemium Only 2016 Met Mast/LiDAR During February 2016 the met mast was dismantled a... Subscribers only field Subscribers only field
Freemium Only 2016 Turbine MPI Adventure carried out turbine maintenance work... Subscribers only field Subscribers only field
Freemium Only 2015 Fully Commissioned All 80 turbines were connected to the grid. The pr... Subscribers only field Subscribers only field
Freemium Only 2015 Turbine Installation MPI Adventure installed the last blade at the wind... Subscribers only field Subscribers only field
Freemium Only 2015 Grid Connection Available HelWin 2 was completed meaning Amrumbank West has ... Subscribers only field Subscribers only field
Freemium Only 2015 Array Cable Installation The remaining 65 submarine array cables will be co... Subscribers only field Subscribers only field
Freemium Only 2015 Foundation The MPI Enterprise entered the site to carry out w... Subscribers only field Subscribers only field
Freemium Only 2015 Generating Power The first turbine is transmitting power to the sub... Subscribers only field Subscribers only field
Freemium Only 2015 Turbine Installation 17 turbines installed (Estimated).... Subscribers only field Subscribers only field
Freemium Only 2015 Foundation Installation The last foundation was installed as MPI Discovery... Subscribers only field Subscribers only field
Freemium Only 2015 Turbine Installation The first turbine at Amrumbank West was installed ... Subscribers only field Subscribers only field
Freemium Only 2014 Foundation Installation Svanen has now left the site allowing MPI Discover... Subscribers only field Subscribers only field
Freemium Only 2014 Foundation Installation MPI Discovery returned to continue foundation and ... Subscribers only field Subscribers only field
Freemium Only 2014 Foundation Installation Ballast Nedam has been contracted to takeover foun... Subscribers only field Subscribers only field
Freemium Only 2014 Other Helwin2 was installed. The platform has a capacity... Subscribers only field Subscribers only field
Freemium Only 2014 Array Cable Installation Siddis Mariner and Siem Moxie continue with array ... Subscribers only field Subscribers only field
Freemium Only 2014 Foundation Installation MPI Discovery left the site after completing the f... Subscribers only field Subscribers only field
Freemium Only 2014 Offshore Substation The unmanned transformer station was installed. Th... Subscribers only field Subscribers only field
Freemium Only 2014 Other Approval BSH issue extension to May 2014 for construction s... Subscribers only field Subscribers only field
Freemium Only 2014 Offshore Substation Heavy lift vessel Rambiz arrived on site to begin ... Subscribers only field Subscribers only field
Freemium Only 2014 Array Cable Installation Array cable installation is scheduled to start in ... Subscribers only field Subscribers only field
Freemium Only 2014 Foundation Installation MPI Discovery was on site preparing for installati... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation The monopiles are at the BOW Terminal and preparat... Subscribers only field Subscribers only field
Freemium Only 2013 Other Scour prevention sand bags have been placed by Pet... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation Installation vessel MPI Discovery has arrived in V... Subscribers only field Subscribers only field
Freemium Only 2013 Other Scour prevention by Peter Madsen is currently ongo... Subscribers only field Subscribers only field
Freemium Only 2013 Geotechnical Site Investigation Geotechnical site investigations took place.... Subscribers only field Subscribers only field
Freemium Only 2013 Other The installation of the scour protection started. ... Subscribers only field Subscribers only field
Freemium Only 2013 Construction - Seabed Preparation Scour protection work started.... Subscribers only field Subscribers only field
Freemium Only 2013 Production and Procurement Production of scour protection for installation in... Subscribers only field Subscribers only field
Freemium Only 2012 Geotechnical Site Investigation Geotechnical soil analysis with the MS "Wind Expre... Subscribers only field Subscribers only field
Freemium Only 2012 Grid Connection Agreed Unconditional grid offer in place with TenneT.... Subscribers only field Subscribers only field
Freemium Only 2011 Financial Close Final Investment Decision - announcement of intent... Subscribers only field Subscribers only field
Freemium Only 2005 Met Mast/LiDAR Met Mast Installed and commissioned on 10th April ... Subscribers only field Subscribers only field
Freemium Only 2004 Consent Authorised Consent authorisation was given by the Federal Mar... Subscribers only field Subscribers only field
Freemium Only 2000 Consent Application Submitted Date of application to BSH.... Subscribers only field Subscribers only field