Germany 400MW Fully Commissioned

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Events overview for Global Tech I

Event Date Event Type Event Description Event Source
Subscribers only field Subscribers only field Subscribers only field Subscribers only field
Freemium Only 2019 Tender Process On 11th October 2019, Global Tech 1 Offshore Wind ... Subscribers only field Subscribers only field
Freemium Only 2019 Grid Connection Available update 08/08/19: Offshore grid connection at BorWi... Subscribers only field Subscribers only field
Freemium Only 2019 Cable installation The first of the interconnecting cables to Borwin ... Subscribers only field Subscribers only field
Freemium Only 2019 Global Tech 1 GmbH has issued a tender on May 29th... Subscribers only field Subscribers only field
Freemium Only 2019 Production and Procurement Atalanti completed the load-out of Deutsche Bucht ... Subscribers only field Subscribers only field
Freemium Only 2019 Turbine SkySpecs carried out inspections of the wind turbi... Subscribers only field Subscribers only field
Freemium Only 2018 Turbine The turbine nacelle which was dismantled in Spring... Subscribers only field Subscribers only field
Freemium Only 2018 Turbine According to Global Tech 1 work is planned to de-i... Subscribers only field Subscribers only field
Freemium Only 2017 Turbine In 2016 and 2017 a total of eight nacelles were de... Subscribers only field Subscribers only field
Freemium Only 2017 Turbine The five turbine nacelles that were de-installed i... Subscribers only field Subscribers only field
Freemium Only 2016 Turbine During May - June 2016 Adwen de-installed a total ... Subscribers only field Subscribers only field
Freemium Only 2016 Performance Monitoring In early April Global Tech I had fed 1TWh of energ... Subscribers only field Subscribers only field
Freemium Only 2016 Tender for helicopter flights for the transport of... Subscribers only field Subscribers only field
Freemium Only 2016 Performance Monitoring In January the wind farm fed over 150GWh of electr... Subscribers only field Subscribers only field
Freemium Only 2015 Fully Commissioned Olaf Scholz, First Mayor of the Free and Hanseatic... Subscribers only field Subscribers only field
Freemium Only 2015 Final Testing Seajacks Hydra vessel was added to fleet to aid co... Subscribers only field Subscribers only field
Freemium Only 2015 Other Commissioning of turbines was still on going, appr... Subscribers only field Subscribers only field
Freemium Only 2015 Generating Power BorWin 2 was fully handed over to TenneT and can t... Subscribers only field Subscribers only field
Freemium Only 2014 Trial operation of the Global Tech 1 to BorWin bet... Subscribers only field Subscribers only field
Freemium Only 2014 Final Testing Connection to BorWin Beta will allow commissioning... Subscribers only field Subscribers only field
Freemium Only 2014 Grid Connection Other In September 2014 Bnetza opened up a ruling (BK6-... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine Installation The 80th, and last, turbine was installed.... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine Installation Installation vessel Bold Tern joined the project s... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine Installation Global Tech 1 Offshore Wind GmbH stated to 4C dire... Subscribers only field Subscribers only field
Freemium Only 2014 Array Cable Installation Array cable installation activities completed in J... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine Installation The turbine installation reached the half way mark... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine Installation The first two rotor stars were installed. The jack... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine Installation Fred. Olsen Windcarrier International Ltd announce... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine Installation The first turbine was installed by the Brave Tern.... Subscribers only field Subscribers only field
Freemium Only 2014 Turbine Installation The first rotor stars were loaded from the pre-ass... Subscribers only field Subscribers only field
Freemium Only 2014 Foundation Installation INNOVATION left the Global Tech site on this date ... Subscribers only field Subscribers only field
Freemium Only 2014 Offshore Substation The commissioning of the transformer substation wa... Subscribers only field Subscribers only field
Freemium Only 2014 Due to TenneT's delay in supplying the grid connec... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation 76 of 80 foundations have been installed and most ... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation The last of the 80 foundations were assembled and ... Subscribers only field Subscribers only field
Freemium Only 2013 Turbine Installation Blade installation vessel VIDAR has arrived in Bre... Subscribers only field Subscribers only field
Freemium Only 2013 Turbine Installation There was still three turbines installed.... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation Five tripods were loaded out from the port of Vlis... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation Construction Update: 64 tripod foundations were in... Subscribers only field Subscribers only field
Freemium Only 2013 Array Cable Installation The CS Sovereign left the project site marking the... Subscribers only field Subscribers only field
Freemium Only 2013 Turbine Installation Turbine installation started with the first three ... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation Construction Update: 53 Tripod foundations current... Subscribers only field Subscribers only field
Freemium Only 2013 Turbine Installation Load-out of the first three nacelles and towers be... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation Construction Update: 47 tripods have now been inst... Subscribers only field Subscribers only field
Freemium Only 2013 Array Cable Installation Whilst cable lay is underway, the second phase of ... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation The 40th (of 80) tripod foundation was installed.... Subscribers only field Subscribers only field
Freemium Only 2013 Foundation Installation Construction Update: 34 of 80 foundations installe... Subscribers only field Subscribers only field
Freemium Only 2013 Offshore Substation The substation complete with its suction cans foun... Subscribers only field Subscribers only field
Freemium Only 2013 Array Cable Installation The CS Sovereign arrived on-site to commence the a... Subscribers only field Subscribers only field
Freemium Only 2012 Grid Connection Other The developer confirmed that it is in negotiations... Subscribers only field Subscribers only field
Freemium Only 2012 Foundation Installation Eight foundations had been installed up to the 7th... Subscribers only field Subscribers only field
Freemium Only 2012 Tender Process Tender opened for offshore module fabrication and ... Subscribers only field Subscribers only field
Freemium Only 2012 Foundation Installation Six tripod foundations had been installed in 16 da... Subscribers only field Subscribers only field
Freemium Only 2012 Foundation Installation The vessel INNOVATION installed the first tripod f... Subscribers only field Subscribers only field
Freemium Only 2012 Turbine Installation SIAG Nordseewerke denied government backed bank lo... Subscribers only field Subscribers only field
Freemium Only 2012 Grid Connection Agreed An unconditional grid offer in place with TenneT e... Subscribers only field Subscribers only field
Freemium Only 2012 Foundation Installation Five test piles were successfully installed by the... Subscribers only field Subscribers only field
Freemium Only 2012 Offshore Construction Starts HGO Innovation mobilised in Bremerhaven and loaded... Subscribers only field Subscribers only field
Freemium Only 2012 Other Approval The Federal Maritime and Hydrographic Agency (BSH)... Subscribers only field Subscribers only field
Freemium Only 2011 Financial Close More than a dozen commercial banks were involved i... Subscribers only field Subscribers only field
Freemium Only 2011 Financing Agreement European Investment Bank (EIB) invested €500m.... Subscribers only field Subscribers only field
Freemium Only 2006 Consent Authorised Consent authorisation was given by the Federal Mar... Subscribers only field Subscribers only field
Freemium Only 2005 Consent Application Submitted Date the application is submitted.... Subscribers only field Subscribers only field

Copyright © 4C Offshore 2019

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore