Germany 288MW Fully Commissioned

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Events overview for Sandbank

Event Date Event Type Event Description Event Source
Subscribers only field Subscribers only field Subscribers only field Subscribers only field
Freemium Only 2019 Offshore Substation Partial shutdown of Sylwin 1 converter station du... Subscribers only field Subscribers only field
Freemium Only 2019 Turbine Pacific Orca arrived on the site to support heavy ... Subscribers only field Subscribers only field
Freemium Only 2019 Turbine MPI Enterprise arrived on site to provide maintena... Subscribers only field Subscribers only field
Freemium Only 2017 Vattenfall and Stadtwerke München (SWM) officially... Subscribers only field Subscribers only field
Freemium Only 2017 Vattenfall and Stadwerke Munchen (SWM) put the win... Subscribers only field Subscribers only field
Freemium Only 2017 Fully Commissioned The 288MW Sandbank wind farm was fully commissione... Subscribers only field Subscribers only field
Freemium Only 2017 Generating Power A total of 65 of the 72 turbines were producing po... Subscribers only field Subscribers only field
Freemium Only 2017 Turbine Installation The MPI Adventure installed the last of 72 turbine... Subscribers only field Subscribers only field
Freemium Only 2017 Turbine Installation The last four turbines were loaded out from the po... Subscribers only field Subscribers only field
Freemium Only 2016 Other Approval The project must have begun construction according... Subscribers only field Subscribers only field
Freemium Only 2016 Turbine Installation As of this date 51 of 72 turbines have been instal... Subscribers only field Subscribers only field
Freemium Only 2016 Turbine Installation 43rd Siemens SWT-4.0-130 wind turbine installed.... Subscribers only field Subscribers only field
Freemium Only 2016 Turbine Installation A total of 21 turbines have been installed up to t... Subscribers only field Subscribers only field
Freemium Only 2016 Generating Power The first of a total of 72 wind turbines has succe... Subscribers only field Subscribers only field
Freemium Only 2016 Turbine Installation Vattenfall announced that the 10th turbine was ins... Subscribers only field Subscribers only field
Freemium Only 2016 Turbine Installation MPI Adventure has successfully erected the first S... Subscribers only field Subscribers only field
Freemium Only 2016 Export Cable Installation The vessel Topaz installer assisted on the final p... Subscribers only field Subscribers only field
Freemium Only 2016 Array Cable Installation VBMS completed its scope of 76 array cables. VBMS ... Subscribers only field Subscribers only field
Freemium Only 2016 Offshore Substation The substation was installed by Seaway Heavy Lifti... Subscribers only field Subscribers only field
Freemium Only 2016 Offshore Substation After approximately 16 months of construction and ... Subscribers only field Subscribers only field
Freemium Only 2016 Offshore Substation The substation and jacket sailed for the wind park... Subscribers only field Subscribers only field
Freemium Only 2016 Array Cable Installation The vessel Ndurance arrived on site to install the... Subscribers only field Subscribers only field
Freemium Only 2016 PreTesting Onshore commissioning and final testing of the sub... Subscribers only field Subscribers only field
Freemium Only 2016 Blue Water started demobilisation of the monopile ... Subscribers only field Subscribers only field
Freemium Only 2016 Foundation Installation The last foundation was installed by the Pacific O... Subscribers only field Subscribers only field
Freemium Only 2016 Foundation Installation A total of 69 monopiles and transition pieces out ... Subscribers only field Subscribers only field
Freemium Only 2015 Foundation Installation To date 58 of 72 monopiles have been installed wit... Subscribers only field Subscribers only field
Freemium Only 2015 Vattenfall put out a tender for the supply, instal... Subscribers only field Subscribers only field
Freemium Only 2015 Production and Procurement Sections of the substation Jacket foundation were ... Subscribers only field Subscribers only field
Freemium Only 2015 Export Cable Installation The laying of the export cabling was completed bef... Subscribers only field Subscribers only field
Freemium Only 2015 Array Cable Installation The Stemat Spirit left the site after installing t... Subscribers only field Subscribers only field
Freemium Only 2015 Array Cable Installation The Stemat Spirit has laid the first subsea power ... Subscribers only field Subscribers only field
Freemium Only 2015 Foundation Installation Installation of foundations started with Pacific O... Subscribers only field Subscribers only field
Freemium Only 2015 Offshore Construction Starts Offshore Installation started with the foundations... Subscribers only field Subscribers only field
Freemium Only 2015 While preparing for offshore construction, 26 mine... Subscribers only field Subscribers only field
Freemium Only 2015 Production and Procurement Bladt Industries started the load out of the first... Subscribers only field Subscribers only field
Freemium Only 2014 Production and Procurement The go-ahead for the production of the 72 steel mo... Subscribers only field Subscribers only field
Freemium Only 2014 Other Vattenfall and Stadtwerke München (SWM) gave the g... Subscribers only field Subscribers only field
Freemium Only 2014 Financial Close Vattenfall and Stadtwerke München (SWM) have made ... Subscribers only field Subscribers only field
Freemium Only 2014 Tender Process The tender process was started for foundation surv... Subscribers only field Subscribers only field
Freemium Only 2014 Tender Process Contract notice published relating to the provisio... Subscribers only field Subscribers only field
Freemium Only 2013 Tender Process Export and array cable contracts for both manufact... Subscribers only field Subscribers only field
Freemium Only 2013 Tender Process Opened the tender for the Design, engineering, man... Subscribers only field Subscribers only field
Freemium Only 2012 Grid Connection Agreed Unconditional grid offer in place with TenneT.... Subscribers only field Subscribers only field
Freemium Only 2012 Tender Process Opened the tender process for the Design, engineer... Subscribers only field Subscribers only field
Freemium Only 2012 Grid Connection Agreed Grid connection agreement from Tennet was awarded ... Subscribers only field Subscribers only field
Freemium Only 2010 Geotechnical Site Investigation Final geotechnical site investigations.... Subscribers only field Subscribers only field
Freemium Only 2004 Consent Authorised Consent authorisation was given by the Federal Mar... Subscribers only field Subscribers only field
Freemium Only 2001 Consent Application Submitted Date of application.... Subscribers only field Subscribers only field