28 Oct 2022: The Federal Maritime and Hydrographic Agency (BSH) published second draft of an updated development plan (FEP). The 2nd draft contains changes and consultation questions on co-use at sea, technical aspects of the grid connection and on development options for hydrogen production and test fields. Other generation area SEN-1 has been expanded from 27 km2 to 95.4 km2. A pipeline and route is not specified by the FEP but any future developer must meet requirement of at least 2 GW a pipeline. There is possibility to connect to an existing pipeline e.g. Europipe 1 pipeline which runs adjacent. The FEP is consulting splitting the area into two (SEN-1 and SEN-2). Responses from developers and industry bodies lobby for smaller staggered tenders to allow increased competition, risk spreading, testing multiple technologies and technology scaling.
Location:
Germany
Status:
Development Zone
Capacity:
425 MW
4C Offshore | Location Map: Lat(54.535) Lon(6.314)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
425 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
54.547392°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life