01 Oct 2021: The Ordinance on Auctioning Sites for Alternative Energy Generation in the Exclusive Economic Zone (SoEnergieV) sets the auction rules and entered into force on 1st October. The Ordinance stipulates qualitative award criteria for the auctions, where sites are allocated to the most promising technology to be implemented in a timely manner:  expected annual volume of energy of the final energy carrier at the handover point,  energy efficiency performance during the conversion and transportation of energy,  technology readiness,  project scalability,  cost of energy, and  any foreseeable significant impact on the marine environment. The Ordinance is also part of the Economic Affairs Ministry’s contribution to implementing the National Hydrogen Strategy. It is anticipated that offshore wind with hydrogen will feature heavily in these areas. It is unclear what role the logistics for integrating the hydrogen produced into onshore infrastructure plays in the auction. The first round of technology neutral auctions will be launched by the BSH from 2022. Bidders will have a six month window until the bid deadline. Successful bidders will be entitled to apply for a planning approval from the BSH and for funding from the federal government, which has earmarked €50 million from 2022 in the context of the energy and climate package. It is not yet clear how many auctions will be planned for subsequent years.
Location:
Germany
Status:
Development Zone
Capacity:
425 MW
4C Offshore | Location Map: Lat(54.535) Lon(6.314)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
425 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
54.534638°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life