01 May 2022: Update 28/4/2022: after some updates to the project made at the request of local public bodies, in a few days Energia Wind are going to deposit the application with the environmental impact assessment. Thanks to the recent simplifications introduced by the government it is assumed that authorisation will be granted by the end of the year. Construction is still planned for early 2023 and have scheduled to finish the windfarm in 18/20 months. 12/9/2021: Energia wind 2020 is preparing the environmental impact assessment (EIA), to be presented to the competent authorities to obtain the necessary authorizations,
Location:
Italy
Status:
Concept/Early Planning
Capacity:
330 MW
4C Offshore | Location Map: Lat(44.123) Lon(12.783)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
330 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Adriatic Sea
Latitude
44.122745°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
2
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life