4C Offshore Empowering Intelligence

Murakami Iwafune Offshore Wind Farm

27 Dec 2017: Construction consortium, which includes Hitachi Zosen, has suspended the project indefinitely, due to costs being more than anticipated for construction etc., they judge that project will not be profitable, at present.
Location:
Japan
Status:
Cancelled
Capacity:
220 MW
4C Offshore | Location Map: Lat(38.210) Lon(139.392)

Subscribers can track wind farms on their dashboard.

General Information
Name
Murakami Iwafune
Other Names
岩船沖洋上風力発電
Country
Japan
Development Status
Cancelled
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Iwafune Offshore Wind Power Generation Company (岩船沖洋上風力発電事業者)

Iwafune Offshore Wind Power Generation Company (岩船沖洋上風力発電事業者)

Operator

Iwafune Offshore Wind Power Generation Company (岩船沖洋上風力発電事業者)

Iwafune Offshore Wind Power Generation Company (岩船沖洋上風力発電事業者)

Owner

Hitachi Zosen Corporation (日立造船株式会社)

Hitachi Zosen Corporation (日立造船株式会社)

Owner

VENTI JAPAN ((株)ウェンティ・ジャパン )

VENTI JAPAN ((株)ウェンティ・ジャパン )

Owner

Sumitomo Electric Industries, Ltd (住友電気工業株式会社)

Sumitomo Electric Industries, Ltd (住友電気工業株式会社)

Owner

Hitachi Capital Corporation(日立キャピタル株式会社)

Hitachi Capital Corporation(日立キャピタル株式会社)

Owner

Hitachi, Ltd. (株式会社日立製作所)

Hitachi, Ltd. (株式会社日立製作所)

Owner

Mitsubishi Corporation (三菱商事株式会社)

Mitsubishi Corporation (三菱商事株式会社)


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

ForeSEE marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. ForeSEE grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the ForeSEE interactive system, access reports, updates, news, downloads and more. To find out more about how ForeSEE software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about ForeSEE
Power & Turbines
Windfarm Capacity
220 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Japan Sea
Latitude
38.209739°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life