Offshore Wind farms in Lithuania

Lithuania has 10 offshore wind farm projects of which none currently operating, none where construction has progressed enough to connect the turbines and generate electricity, none are in the build phase, and none are either consented or have applied for consent. You can access over 80 data sets on each wind farm subject to your access level and drill down to see items such as:

on project 'Lithuanian Tender 1 - 2023' on Thursday, 21 January 2021, the following was announced: 'Ardynas has been selected to conduct the strategic environmental assessment and prepare an engineering infrastructure development plan. This will be complete within 18 months.'

login to improve information access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads. Sign up now!

Copyright © 4C Offshore 2021

  • ISO 14001 173953 2015 AHSO GBR UKAS 2 | 4C Offshore
  • Achilles UVDB Supply Chain Community | 4C Offshore