Prinses Amaliawindpark Offshore Wind Farm

15 Oct 2021: Update 15th October: Heerema Marine Contractors has tested its novel Rotor Nacelle Assembly (RNA) installation method offshore for the first time using floating installation vessel Sleipnir and testing DOT’s Slip Joint connection. TU Delft researchers conducted a measurement campaign during turbine installation. The data will be used to look into new control methods to reduce wave and wind induced motions of wind turbine components during installation. The monopile used was installed in 2018 as part of a previous test project known as SJOR. All components were also removed after testing. Consortium DOT, TUD and Heerema will undertake a trial turbine installation from a floating vessel (Sleipnir) using a medium-sized turbine at Prinses AmaliaWindPark in Q3 2021. This is ahead of floating turbine installations at Arcadis Ost.
Location:
Netherlands
Status:
Fully Commissioned
Capacity:
120 MW
4C Offshore | Location Map: Lat(52.588) Lon(4.224)

Subscribers can track wind farms on their dashboard.

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
120 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
52.587889°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
1
Average Length per Cable
Comments
Expected Life