Hywind Tampen Floating Wind Farm

23 Aug 2023: Update 23 August 2023: Equinor begins full commercial operation of the wind farm. Update 01/08/2023: Hywind Tampen has yet to be fully commissioned. Update April 2023: full commissioning of the entire wind park expected in H2 2023. Update 30 August 2022: Equinor has announced that the subsea cables have been laid and connection was made. The first 7 Hywind Tampen turbines will produce first power later this year. Update July 2022: Supply chain bottlenecks, most notably related to the global market for steel, preclude delivery of the final four tower sections for the wind turbines until September 2022. This will be too late in relation to the installation weather window for the year, postponing installation of the remaining four turbines until Spring next year.  Update April 2021: Equinor plans to complete the offshore work by the end of 2022. According to the preliminary schedule the fully commission is expected in Q3 2022, after testing and commissioning of the offshore wind farm (late September 2022).
Location:
Norway
Status:
Fully Commissioned
Capacity:
95 MW
4C Offshore | Location Map: Lat(61.328) Lon(2.269)

Subscribers can track wind farms on their dashboard.

General Information
Name
Hywind Tampen
Country
Norway
Development Status
Fully Commissioned
Category or Round
Unlock with a freemium account
Region
Unlock with a freemium account
Comments
Unlock with a freemium account
Website
Unlock with a freemium account

Developers/Owners/Operators
Type
Organisation

Developer

Equinor ASA (previously Statoil ASA)

Equinor ASA (previously Statoil ASA)

Operator

Equinor ASA (previously Statoil ASA)

Equinor ASA (previously Statoil ASA)

Owner

Vår Energi

Vår Energi

Owner

Wintershall Dea Norge AS (formerly DEA Norge AS)

Wintershall Dea Norge AS (formerly DEA Norge AS)

Owner

INPEX Idemitsu Norge AS

INPEX Idemitsu Norge AS

Owner

Petoro AS

Petoro AS

Owner

OMV (Norge) AS

OMV (Norge) AS

Owner

Equinor ASA (previously Statoil ASA)

Equinor ASA (previously Statoil ASA)


Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning
Unlock with a freemium account

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

How does the database work?

4C Offshore marine intelligence software provides you with exclusive access to a range of specialised services including the Global Offshore Wind Farm Database. 4C Offshore grants you exclusive access to online and offline databases, reports, newsletters, online tools and more.

There are three levels of access: Free, Freemium and Full. Freemium allows you to personalise notifications, use the search function and access more data.

You will need Full access to use the 4C Offshore interactive system, access reports, updates, news, downloads and more. To find out more about how 4C Offshore software works and the benefits of Full access, enquire below.

Sign up to Freemium Enquire about 4C Offshore
Power & Turbines
Windfarm Capacity
95 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Norwegian Sea
Latitude
61.328421°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life