TetraSpar Demonstrator - Metcentre Floating Wind Farm

01 Dec 2021: Update 1/12/2021: TetraSpar Demonstrator is now commissioned and in operation, connected to Norway's grid. The 3.6 megawatt turbine has already been deployed on site and was recently connected with a transmission cable. There have been some delays but it will be commissioned soon. Update August 2021 : Project test period to commence in Q3 2021. Update November 2020: Full commissioning is now expected by mid-2021. Update June 2020: Full operations is now expected in early 2021. COVID-19 impacted the progress of this project. Update April 2019: It is expected that the project will be fully commissioned by end H1 2020. It is expected that project will be fully commissioned by end of 2019 .
Location:
Norway
Status:
Fully Commissioned
Capacity:
3.6 MW
4C Offshore | Location Map: Lat(59.151) Lon(5.013)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
3.6 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
North Sea
Latitude
59.150751°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
0
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life