Bałtyk II Offshore Wind Farm

31 Aug 2022: MFW Bałtyk II sp. z o.o. and MFW Bałtyk III sp. z o.o. announced their intention to conduct a dialogue with potential suppliers of materials and services pursuant to Article 46 of the Act of 17 December 2020 on the promotion of electricity generation in offshore wind farms ("Dialogue"). The dialogue schedule is outlined below: -Announcement of the intention to conduct the Dialogue ("Announcement") – 31.08.2022  -Completion of collection of applications for the Dialogue – 30.09.2022  -Qualification of suppliers' applications – up to 5 days after the end of collection of applications  -Dialogue with suppliers - within 5 days after completion of qualification of suppliers' applications (preliminary – 06.10.2022) -Distribution of invitation to tender to selected participants of the Dialogue – within 5 days from the date of the Dialogue with -suppliers  -Award of contract – March 2023  Developers intend to issue invitation to tender for turbine installation, offshore substation installation and onshore cable installation in Q4 2022. This will be followed by turbine foundation installation, onshore cable connection and onshore substation ITTs in Q1 2023.
Location:
Poland
Status:
Consent Application Submitted
Capacity:
720 MW
4C Offshore | Location Map: Lat(55.083) Lon(16.883)

Subscribers can track wind farms on their dashboard.

Login

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
720 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Baltic Sea
Latitude
55.083321°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Unlock with a freemium account
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life