Latest event on Robin Rigg

MPI ADVENTURE scheduled to carry out a component exchange at turbine positions H01, G01 and F05, this work can be expected to last for a period of at least 10 days. Read more

Latest Update: 06 March 2018

You can help keep this an open resource by submitting new information. Simply click on the correct pencil icon.
Developers/Owners/Operators Database in Excel | Add your Organisation
RoleOrganisation 
Developer
correct
Operator correct
Operator-Offshore Transmission correct
Owner correct
Owner-Offshore Transmission
TC Robin Rigg OFTO Ltd (Transmission Capital Partners)
correct
Project Details for Robin Rigg
General Information Name Robin Rigg correct
Other names correct
Country name United Kingdom correct
Region Scotland, Dumfries & Galloway correct
Comments MT Hojgaard was sued by E.ON in April 2014 due to problems with the grouting. In April 2015 this court ruling was overturned by the London Court of Appeal. correct
Round (or category) Round 1 correct
Development status Fully Commissioned correct
Power & Turbines Project capacity 174 MW correct
Turbine model V90-3.0 MW Offshore (Vestas) correct
Turbine capacity 3 MW correct
Number of turbines 58 correct
Total turbine height 125 m correct
Hub height 80.00 m correct
Rotor diameter 90 m correct
Foundation Grounded: Monopile correct
Windspeed 10 year mean wind speed (2000-2009) Available online now
Costs Stated project cost GBP(mill) 381.00 correct
Location & Environment Sea name Irish Sea correct
Centre latitude 54.756° correct
Centre longitude -3.711° correct
Area 18 km2 correct
Depth range (Chart Datum) 0 m - 12 m correct
Depth range stated by developer 4 m - 13 m correct
Distance from shore (reported) 11 km correct
Distance from shore (computed from centre) 11.5 km correct
Ports Installation base Maryport, Workington and Whitehaven. Belfast and Mostyn (pre-assembly) correct
Ops and maintenance Workington correct
Grid Converter/Collector platforms None correct
Offshore transformers Robin Rigg East Substation, Robin Rigg West Substation correct
Grid connection point 2km inland from Seaton, Cumbria correct
Cable landing point Seaton, Cumbria correct
Export Cables
Please note that export cables connect the offshore transformer (substation) to either; shore or an offshore HVAC-HVDC converter station for onward transmission via HVDC cabling. Please see the converters page for planned converter stations and transmission cables.

The export cable length does not generally include the onshore component. The exception is when the onshore substation is close to shore.
Number of export cables 2 correct
Average length per cable 12.5 km correct
Transmission type (e.g. HVAC) AC correct
Nominal voltage 132 kV correct
Maximum voltage correct
Power rating correct
Number of cores 3 correct
Conductor type Cu correct
Section area 300 mm2 correct
Insulation XLPE correct
Number fibre optics 48 correct
Export minimum bend radius (MBR) correct
Burial depth 3 m correct
Comments correct
Onshore Cables Number of onshore cables 2 correct
Average length per cable 1.8 km correct
Comments 132kV correct
Array Cables Array cable length 42 km correct
Estimated cable length LogIn
Transmission type (e.g. MVAC) MVAC correct
Nominal voltage 33 kV correct
Maximum voltage 36 kV correct
Burial depth correct
Number of cores 3 correct
Conductor type Cu correct
Section 150 /400 mm2 correct
Insulation correct
Power rating correct
Number of fibre optics correct
Minimum bend radius (MBR) correct
Comments 24,8km 36kV 3x150mm2 and 24,8km 36kV 3x150mm2 power cables correct
Benefits Homes powered annually 123236 correct
CO2 reduced per year 249061 tonnes correct
SO2 reduced per year 5792 tonnes correct
Expected life 20.0 years correct
Other Website Visit correct

Call +44 (0)1502 307 037 for more information

Keep on top of the market. Perform analysis. Make informed decisions.

CONTACT US

More information?

Receive monthly updates with our Offshore Windfarm Subscription and gain access to even more detailed information on; cabling, converters, costs, foundations, substations, turbines.

Filter :
123
StatusName
Decommissioned Beatrice Demonstration Beatrice Demonstration
Decommissioned Blyth Blyth
Fully Commissioned Barrow Barrow
Fully Commissioned Blyth Offshore Demonstrator Project - Array 2 Blyth Offshore Demonstrator Project - Array 2
Fully Commissioned Burbo Bank Burbo Bank
Fully Commissioned Burbo Bank Extension Burbo Bank Extension
Fully Commissioned Dudgeon Dudgeon
Fully Commissioned Galloper Galloper
Fully Commissioned Greater Gabbard Greater Gabbard
Fully Commissioned Gunfleet Sands Gunfleet Sands
Fully Commissioned Gunfleet Sands 3 - Demonstration Project Gunfleet Sands 3 - Demonstration Project
Fully Commissioned Gwynt y Môr Gwynt y Môr
Fully Commissioned Humber Gateway Humber Gateway
Fully Commissioned Hunterston Test Centre - Mitsubishi 7MW (onshore) Hunterston Test Centre - Mitsubishi 7MW (onshore)
Fully Commissioned Hunterston Test Centre - Siemens 6MW (onshore) Hunterston Test Centre - Siemens 6MW (onshore)
Fully Commissioned Hunterston Test Centre (onshore) Hunterston Test Centre (onshore)
Fully Commissioned Hywind Scotland Pilot Park Hywind Scotland Pilot Park
Fully Commissioned Inner Dowsing Inner Dowsing
Fully Commissioned Kentish Flats Kentish Flats
Fully Commissioned Kentish Flats Extension Kentish Flats Extension
Fully Commissioned Levenmouth demonstration turbine Levenmouth demonstration turbine
Fully Commissioned Lincs Lincs
Fully Commissioned London Array London Array
Fully Commissioned Lynn Lynn
Fully Commissioned North Hoyle North Hoyle
Fully Commissioned Ormonde Ormonde
Fully Commissioned Race Bank Race Bank
Fully Commissioned Rhyl Flats Rhyl Flats
Fully Commissioned Robin Rigg Robin Rigg
Fully Commissioned Scroby Sands Scroby Sands
Fully Commissioned Sheringham Shoal Sheringham Shoal
Fully Commissioned Teesside Teesside
Fully Commissioned Thanet Thanet
Fully Commissioned Walney Phase 1 Walney Phase 1
Fully Commissioned Walney Phase 2 Walney Phase 2
Fully Commissioned Wave Hub Wave Hub
Fully Commissioned West of Duddon Sands West of Duddon Sands
Fully Commissioned Westermost Rough Westermost Rough
Partial Generation/Under Construction Aberdeen Offshore Wind Farm (EOWDC) Aberdeen Offshore Wind Farm (EOWDC)
Partial Generation/Under Construction Rampion Rampion
Partial Generation/Under Construction Walney Extension Walney Extension
Under Construction Beatrice Beatrice
Under Construction East Anglia ONE East Anglia ONE
Under Construction Hornsea Project One Hornsea Project One
Pre-Construction Hornsea Project Two Hornsea Project Two
Pre-Construction Kincardine Offshore Windfarm Project Kincardine Offshore Windfarm Project
Consent Authorised Blyth Offshore Demonstrator Project - Array 3A & 4 Blyth Offshore Demonstrator Project - Array 3A & 4
Consent Authorised Dogger Bank - Creyke Beck A Dogger Bank - Creyke Beck A
Consent Authorised Dogger Bank - Creyke Beck B Dogger Bank - Creyke Beck B
Consent Authorised Dogger Bank - Teesside A Dogger Bank - Teesside A
123
Please LogIn to follow projects
Find quick and easy project and company information with our online search tool

Keep on top of the market. Perform analysis. Make informed decisions.

This page is intended to be viewed online and may not be printed without a valid subscription.

Please view this page at https://www.4coffshore.com/windfarms/windfarms.aspx?windfarmID=uk20.