Southwest Offshore - phase 2 Offshore Wind Farm

26 May 2022: An agreement was reached between the Ship Owners Association and Korea Offshore Wind Power Co. to proceed with the 400 MW offshore wind project in Gochang-gun. The project will now need to receive consent from the fishermen's association, before it received the consent of local residents, and is able to proceed with EPC contracts.
Location:
South Korea
Status:
Consent Application Submitted
Capacity:
400 MW
4C Offshore | Location Map: Lat(35.500) Lon(126.201)

Subscribers can track wind farms on their dashboard.

General Information
Name
Southwest Offshore - phase 2
Other Names
서남해 시범단지 400MW; Northwest Wind Power in the Southwest Sea; Seonam Offshore Wind Farm
Country
South Korea
Development Status
Consent Application Submitted
Category or Round
Unlock with a freemium account
Region
Comments
Website

Developers/Owners/Operators
Type
Organisation

Offshore Construction Starts
Submitted For Consent
Consent Authorised
Financial Close
First Power
Full Commissioning

Revenue Mechanism
Revenue Details
Revenue
/MWh (EUR /MWh)

Login to Improve Information Access

There are three levels of access, Free, Freemium (requires a sign-up – for free – and password access) and “Full” (Password access).
You need Full access to use the ForeSEE interactive system, access reports, updates, notes, news and downloads.

Sign up now!
Power & Turbines
Windfarm Capacity
400 MW
Turbine Model
Unlock with a freemium account
Other Turbine(s) Used
Min. Turbine Capacity (MW)
Max. Turbine Capacity (MW)
Min. Number of Turbines
Unlock with a freemium account
Max. Number of Turbines
Total Turbine Height
Hub Height
Rotor Diameter
Foundation Type
Unlock with a freemium account
Foundations on Wind Farm
Foundation Comments

Location & Environment
Sea Name
Yellow Sea
Latitude
35.499662°
Longitude
Area
Unlock with a freemium account
Depth Range (Chart Datum)
Depth Range (Stated by Developer)
Distance from Shore (Developer)
Unlock with a freemium account
Distance from Shore (Computed)

Ports
Installation Base
Unlock with a freemium account
Ops and Maintenance
Unlock with a freemium account

Grid
Number of Offshore Platform(s)
1
Shared Platform Type
Grid Connection Point
Cable Landing Point

Export Cables (AC & DC)
Number of Export Cables (AC)
Unlock with a freemium account
Average Length per Cable (AC)
Additional Requirements (AC)
Nominal Voltage (AC)
Number of Export Cables (DC)
Average Length per Cable (DC)
Unlock with a freemium account
Additional Requirements (DC)
Nominal Voltage (DC)

Nominal Voltage
Comments

Onshore Cables
Number of Onshore Cables
Average Length per Cable
Comments
Expected Life